Closing soon

VLF Testing Medium Voltage for 75 underground Power Lines - (Request for Quotation)

Description: VLF Testing: The contractor shall develop and execute a comprehensive VLF testing plan that ensures the integrity and reliability of the medium voltage power lines. The plan must be submitted for government approval and, upon execution, must verifiably demonstrate that the system meets or exceeds the performance standards. Stages: Work may not proceed until the Government has certified the testing schedule. On-site design kick-off shall occur within two weeks after notice-to-proceed. The contractor shall spend a minimum of 16 hours on site (exclusive of travel time) to review existing equipment, utilities, drawings, client operations, client requests, and scenario development. Verify conditions and dimensions of existing power distribution. If necessary, remove existing construction to expose concealed elements or systems requiring verification. Patch exploratory areas to maintain integrity, weather-tightness, and safety of electrical system. See attached file.

Buyer
Air Force Reserve Command

Federal · GA, US

Released
Aug 11, 2026
Closes
Sep 9, 2026(6 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts