Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The scope of the project generally includes electrical demolition, installation of new LED lights and signage,\r and associated electrical improvements for Runway 4-22, at the Valdosta Regional Airport.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Runway and taxiway grading improvements project.
Posted Date
Nov 16, 2025
Due Date
Dec 18, 2025
Release: Nov 16, 2025
Close: Dec 18, 2025
Runway and taxiway grading improvements project.
AvailablePremium
Access the largest public sector contact database
Project will replace runway and taxiway lighting and replace and relocate REILs and PAPIs. This will include new conduit, base cans, wiring, a new vault enclosure and regulator. Replacing the beacon light is an alternate bid item.
Posted Date
Jun 9, 2025
Due Date
Jul 8, 2026
Release: Jun 9, 2025
Close: Jul 8, 2026
Project will replace runway and taxiway lighting and replace and relocate REILs and PAPIs. This will include new conduit, base cans, wiring, a new vault enclosure and regulator. Replacing the beacon light is an alternate bid item.
AvailableWell #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
Posted Date
Dec 10, 2025
Due Date
Jan 30, 2026
Release: Dec 10, 2025
Close: Jan 30, 2026
Well #4 and Well #5 Electrical and Water System Improvement project includes various electrical, mechanical, HVAC, SCADA and site improvements to the existing Well #4 and Well #5 stations. Improvements include the following: selective demolition, furnish and install existing motor control centers, appropriate surge protection, step-down transformers, 120/208V panelboards, and install new 100hp variable frequency drives; replace existing interior and exterior lighting; upgrade of existing SCADA panels; furnish and install all necessary piping to connect new pump control valve, painting of all process piping; furnish and install new electrical unit heaters, exhaust fans, and louver actuators; existing driveway replacement for well #5, construction of a permanent foundation for the existing well 5 generator, well #5 generator modification and installation on permanent foundation, perimeter fencing removal and replacement, and new sliding access gates; and replacement of the existing acoustical panel ceilings. The project includes the installation of a new 300hp variable frequency drive and furnish and install motor replacement of the existing Well #2.
AvailableConstruct new and replacement electrical infrastructure that supports terminal operations, electric vehicle charging, and harbor craft shore power systems. Base Bid A includes construction of new 15 kV medium-voltage infrastructure consisting of switchgear, transformers, switchboards, pad-mounted switches, panelboards, duct banks, conduits, manholes, pull boxes, grounding systems, and all associated civil, paving, and restoration work. The work also includes installation of Electric Vehicle Supply Equipment (EVSE), comprising six charging towers and twelve dispensers, performed exclusively by EVITP-certified electricians. Additional work includes exterior lighting, telecommunications and fiber optic cabling, protective bollards, and field testing, startup, commissioning, and equipment training for Port personnel. Base Bid B includes construction of a new Harbor Craft Shore Power Outlet system consisting of a shore power vault, 480V switchboard, 15kV load interrupter switch, transformers, panelboards, conduit, cabling, grounding, fencing, and associated civil improvements. Work also includes integration with existing medium-voltage systems, testing, and commissioning in coordination with terminal operations. Additive Bid C includes Port Tenant “Jankovich” electrical upgrades, consisting of new switchboard and transformer installations, conduit and duct bank construction, grounding systems, protective fencing and bollards, electrical cut-overs, temporary generator power, and coordination with SDG&E for final energization.
Posted Date
Nov 3, 2025
Due Date
Dec 17, 2025
Release: Nov 3, 2025
Close: Dec 17, 2025
Construct new and replacement electrical infrastructure that supports terminal operations, electric vehicle charging, and harbor craft shore power systems. Base Bid A includes construction of new 15 kV medium-voltage infrastructure consisting of switchgear, transformers, switchboards, pad-mounted switches, panelboards, duct banks, conduits, manholes, pull boxes, grounding systems, and all associated civil, paving, and restoration work. The work also includes installation of Electric Vehicle Supply Equipment (EVSE), comprising six charging towers and twelve dispensers, performed exclusively by EVITP-certified electricians. Additional work includes exterior lighting, telecommunications and fiber optic cabling, protective bollards, and field testing, startup, commissioning, and equipment training for Port personnel. Base Bid B includes construction of a new Harbor Craft Shore Power Outlet system consisting of a shore power vault, 480V switchboard, 15kV load interrupter switch, transformers, panelboards, conduit, cabling, grounding, fencing, and associated civil improvements. Work also includes integration with existing medium-voltage systems, testing, and commissioning in coordination with terminal operations. Additive Bid C includes Port Tenant “Jankovich” electrical upgrades, consisting of new switchboard and transformer installations, conduit and duct bank construction, grounding systems, protective fencing and bollards, electrical cut-overs, temporary generator power, and coordination with SDG&E for final energization.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis