Aug 12, 2026
Closes
Aug 24, 2026
Equipment - Guldmann Patient Ceiling Lift Systems (Request for Quotes) Bronx
Provide Guldmann patient ceiling lift systems equipment. The contractor must provide all the specific deliverables described below. Contractor must provide all qualified personnel, materials, equipment and services necessary to install 171 patient ceiling lift system. Contractor must remove any waste and debris from each room where a lift is installed. Contractor is responsible for the removal of the existing 171 ceiling lift system at no additional cost. Contractor must install the lifts without relocating or interfering with operations of existing infrastructure such as sprinkler heads, lights, HVAC grills, curtain tracks, IV tracks, televisions, permanent furniture, and other permanent structures. See attached file.