Village Of Tuscarawas
Installation of 2,700 LF of 8" Ductile Iron water line. The water line will have 26 service connections of varying sizes, 10 gate valves of varying sizes, 6 tie-ins to existing water lines, and 5 fire hydrant assemblies. Also, a storm sewer extension consisting of 1,100 LF of 12" PVC pipe, 5 storm sewer catch basins, 3 storm manholes, and 1 junction chamber.
Release
Oct 01, 2024
Close
Oct 22, 2024