Adamsdale Well GAC Media Replacement and Disposal RFP
Adamsdale well GAC media replacement and disposal.
Description: Work includes approx. of installation of concrete foundation for the granular activated carbon vessels.
SpecialDistrict · FL, US
From the first pre-RFP signals to the published RFP and its files.
Agenda packet
196 days before RFP
ECUA proposed completing Villa Road Well GAC design, constructing the foundations, bidding the vessel and site-piping work, and commencing construction in FY27.
Status of Proposed FY26 Accomplishments Proposed FY27 Accomplishments • Commence engineering design for those wells that require PFAS removal that do not currently have treatment (8 wells). • This is an ongoing effort. • Complete the construction of the GAC vessel foundations for Royce, W & Avery, Hagler, Nine Mile, and Olive. • The foundations for Royce…
Emerald Coast Utilities Authority Citizens' Advisory Committee Special Meeting
Agenda packet · Apr 15, 2026
Agenda packet
190 days before RFP
ECUA proposed $66,500 of PFAS-settlement-funded MESI engineering services for the Villa Well GAC foundation-related installation and piping work.
General Resolution No. R-26-43 Page 1 of 3 ECUA General Resolution NO. R-26-43 GR26-43 A GENERAL RESOLUTION AUTHORIZING THE EXECUTIVE DIRECTOR TO SIGN AN ENGINEERING SERVICES PROPOSAL FROM MUNICIPAL ENGINEERING SERVICES INC., FOR ENGINEERING SERVICES FOR THE PIPING SYSTEM FOR A GRANULAR ACTIVATED CARBON TREATMENT SYSTEM TO TREAT THE WATER FROM THE VILLA…
Board meeting
92 days before RFP
ECUA staff reported ongoing Villa-related PFAS treatment preparation, including piping and foundation work, across a rollout targeting early 2028.
>> At this point in time, we have 16 wells with GAC uh treatment in operation. Three of those wells, the GAC is for iron. We're going to have to also put in treatment for PAS because the carbon you use for iron will not work for PAS and vice versa. That's like the the Villa well and Sweeney now Lilian well because of the reduction in the flow. We're going…
Agenda packet
1 day before RFP
ECUA's settlement-fund activity report listed a $399,771.60 capital-project encumbrance for Villa Well GAC Treatment as of September 30, 2026.
Capital Project Encumbrances: PFAS0001-Villa Well GAC Treatment 399,771.60 PFAS0002-Royce Well GAC Treatment 743,759.32 PFAS0003-W&Avery GAC Treatment 383,905.70 PFAS0005-Hagler Well GAC Treatment 632,178.66 PFAS0007-Tennant Well GAC Treatment 393,089.80 PFAS0008-Olive Rd Well GAC Treatment 237,960.80 PFAS0009-Sweeney Well GAC Treatment 428,757.65…
Emerald Coast Utilities Authority Board Meeting Minutes
Agenda packet · Oct 27, 2026
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (1 days left)
Decision makers connected to this RFP from Emerald Coast Utilities Authority.
Emerald Coast Utilities Authority Citizens' Advisory Committee Regular Meeting
Agenda packet · Apr 21, 2026
Ecua Board Board Meeting
Board meeting · Jul 28, 2026
Adjacent opportunities open for bidding right now.
Posted
Nov 12, 2026
Dec 3, 2026
Adamsdale well GAC media replacement and disposal.
CityMN
Posted
Nov 3, 2026
Dec 3, 2026
Project consists of construction of well no. 6; construction of a masonry building; installation of underground raw watermain piping and valves; raw water process piping and valves in the water treatment plant; electrical, controls, plumbing, and hvac.
CityWI
Posted
Oct 28, 2026
Dec 1, 2026
The City of Eau Claire seeks bids for test well drilling, pumping, and sampling services for up to six exploratory wells. A 5% bid bond is required, and electronic bidding is available through DemandStar. The posting lists no pre-bid conference and identifies a bid document/specifications package.
CityMO
Posted
Nov 3, 2026
Dec 8, 2026
Construction of two new drinking water wells and misc. Components near the new water treatment plant site.