Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cooling tower replacement.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Furnish and install a 1,000 ton cooling tower along with associated pump and piping to replace the existing cooling tower.
Posted Date
Dec 16, 2025
Due Date
Jan 22, 2026
Release: Dec 16, 2025
Close: Jan 22, 2026
Furnish and install a 1,000 ton cooling tower along with associated pump and piping to replace the existing cooling tower.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Cooling tower water treatment.
Posted Date
Dec 29, 2025
Due Date
Jan 21, 2026
Release: Dec 29, 2025
Close: Jan 21, 2026
Cooling tower water treatment.
AvailableReplacement of a cooling tower.
Posted Date
Jan 9, 2026
Due Date
Jan 30, 2026
Release: Jan 9, 2026
Close: Jan 30, 2026
Replacement of a cooling tower.
AvailableProvide construction of the central plant cooling tower replacement. Scope of the work is to address the necessary repairs and upgrades at the central plant: demolition and removal of existing components: old cooling tower. Two cooling tower water pumps. Associated piping, supports, controls, and electrical equipment. Related structural pads and pedestals. Water filtration system. Other items per plans and specifications. The installation of the following components. New two-cell cooling tower to connect in parallel with the existing cooling tower. Two new cooling tower water pumps. New control panels for equipment and vfds with side mounted air conditioning units. Upgrades of mechanical piping, electrical, and control systems. New cover/canopy to protect miscellaneous electrical and control panels from weather elements and rain.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Provide construction of the central plant cooling tower replacement. Scope of the work is to address the necessary repairs and upgrades at the central plant: demolition and removal of existing components: old cooling tower. Two cooling tower water pumps. Associated piping, supports, controls, and electrical equipment. Related structural pads and pedestals. Water filtration system. Other items per plans and specifications. The installation of the following components. New two-cell cooling tower to connect in parallel with the existing cooling tower. Two new cooling tower water pumps. New control panels for equipment and vfds with side mounted air conditioning units. Upgrades of mechanical piping, electrical, and control systems. New cover/canopy to protect miscellaneous electrical and control panels from weather elements and rain.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →