OtherKY
Posted
-
Oct 26, 2026
Valvoline Instant Oil Change Hueytown AL RFP
Project consists of new construction - valvoline instant oil change.
Description: Work includes to construct a new valvoline oil change facility. The project scope is: complete site work improvements, and utilities. Site is 1.64 AC (1.4 AC disturbed) to include concrete paving, asphalt paving, striping, landscaping, and other site improvements per plans, and specifications within documents. New wood framed, structural steel, and wood truss supported building with included finished sales space (1st floor = 1,794 SF & basement = 1,771 SF). Exterior finishes include architectural shingle roof, stone veneer, and fiber cement siding. Interiors include frp1, diamond plate finishes, paint, wall framing, drywall, ceilings, and full meps.
Other · KY, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
OtherKY
Posted
-
Oct 26, 2026
Project consists of new construction - valvoline instant oil change.
South Carolina Department of Transportation
State AgencySC
Posted
Oct 7, 2026
Nov 10, 2026
Work includes clearing and grubbing within right of way, removal and disposal item no 001, removal and disposal of existing asphalt pavement 132.000 SY, removal of exist guardrail 2,632.000 LF, removal and disposal of existing bridge, borrow excavation 729.000 CY, muck excavation 26,021.000 CY, geogrid reinforcement (uniaxial) 1,400.000 SY, fine grading 2,522.000 SY, liquid asphalt binder pg64-22 257.000 Ton, full depth asph pav patching 6" unif 100.000 SY, milling existing asphalt pavement (variable) 336.000 SY, asphalt base course type b 647.000 Ton, asphalt intermediate course type c 3,745.000 Ton. See attached file.
OtherGA
Posted
-
Oct 22, 2026
Project includes new construction.
Posted
Sep 26, 2026
Dec 18, 2026
Work includes lottery gaming system and instant ticket printing.