CityNC
Posted
Oct 28, 2026
Nov 12, 2026
Pump Station Replacement Parts RFP
Supply replacement parts and components compatible with existing Gorman-Rupp pump equipment at the City of Rocky Mount Wastewater Treatment Plant.
Description: Provide 2 EA shaft, articulated, flowrox; 4 EA joint kit, for flowrox el; 4 EA rotor, pc el200/6, 1.4404+cr; 8 EA stator, progressive cavity.
SpecialDistrict · MA, US
Adjacent opportunities open for bidding right now.
CityNC
Posted
Oct 28, 2026
Nov 12, 2026
Supply replacement parts and components compatible with existing Gorman-Rupp pump equipment at the City of Rocky Mount Wastewater Treatment Plant.
CityFL
Posted
Oct 29, 2026
Nov 13, 2026
The City of Plantation is requesting sole/single-source information for the purchase of Flygt Pump Genuine Parts and Accessories. The procurement is an intent for sole/single-source procurement, rather than a competitive solicitation. Electronic bids are accepted through the stated deadline of November 13, 2026, at 11:00 a.m. Eastern.
Middlesex County Utilities Authority
Special DistrictNJ
Posted
Oct 23, 2026
Nov 10, 2026
The contractor shall furnish and deliver new, current-manufacture pump equipment, components, and spare parts, including one complete ABBA Replacement Bare Pump Model FMN1015/T60 (equipped with volute, front head, impeller, impeller wear ring, back head with empty stuffing box to accommodate a Chesterton mechanical seal, and complete bearing frame), a 410 stainless steel front head wear ring, a 410 stainless steel impeller wear ring, a Chesterton complete split mechanical seal, and a Chesterton Spiral Trac bushing, with all freight charges prepaid
Posted
Sep 24, 2026
Nov 16, 2026
Pump, Centrifugal - and Similar Replacement Parts, in Repair/modification Of, NSN 7H-4320-014918644, TDP VER 006, QTY 3 Ea
From the first pre-RFP signals to the published RFP and its files.
Capital improvement plan
351 days before RFP
The FY26 CIP lists future rehabilitation of the Gillis, Newton Street, and Lexington Street pump stations because aging pumps may lack available replacement parts.
Pump Station Rehabilitation Design CA (7526), Construction (7527), and REI (7720) Rehabilitation of the Gillis, Newton Street, and Lexington Street pump stations. The pumps in these stations are over 20 years old and maintenance of the existing units will be an issue mostly due to availability of replacement parts. More efficient units will be installed…
Massachusetts Water Resources Authority Capital Improvement Program 2026
Capital improvement plan · Nov 17, 2025
Proposed budget
351 days before RFP
MWRA's FY26 Final Capital Improvement Program included $12.4 million for Hayes Pump Station Rehabilitation, requiring replacement or rehabilitation of its major facility components.
The FY26 CIP represents an update to the FY25 CIP and was approved by the MWRA Board in June 2025. The spending projections are the result of prioritizing the projects, establishing realistic estimates based on the latest information, striking a balance between maintenance and infrastructure improvements, and ensuring that there is adequate support for…
Board meeting
132 days before RFP
The FY26 CIP variance report recorded $1.3 million of less-than-planned spending for Screw Pump Replacement Phase 2 construction because of schedule changes.
ATTACHMENT 3 FY26 CIP Variance Report ($000s) $ % Interception & Pumping (I&P) $27,042 $14,060 ($12,983) -48.0% Less than planned spending Hayes Pump Station Rehab - Construction and REI: $5.0M (contractor progress less than anticipated) Siphon Structure Construction: $1.9M, Cottage Farm PCB Abatement Construction 1: $1.8M, Cottage Farm/Prison Point…
RFP published
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalProposals due (14 days left)
Massachusetts Water Resources Authority FY2026 Proposed Budget
Proposed budget · Nov 17, 2025
Massachusetts Water Resources Authority Board of Directors Meeting Minutes
Board meeting · Jun 24, 2026
$1.2M, Chemical Pipe Replacement - Construction: $1.5M, Screw Pump Replacement Phase 2 - Construction: $1.0M, and Odor Control Rehab - Design/ESDC: $833k (schedule changes)
Massachusetts Water Resources Authority Board Of Directors Meeting Agenda
Agenda packet · May 20, 2026
Decision makers connected to this RFP from Massachusetts Water Resources Authority.