Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The general items of work include, but are not limited to, removal and replacement of asphalt concrete pavement, pcc curb ramps, pcc sidewalk, pcc driveways, pcc curb & gutter, new traffic signal and street lighting system, irrigation and landscaping, adjusting utility manholes and covers, signing and striping, and other associated roadway work items.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
Posted Date
Dec 2, 2025
Due Date
Jan 6, 2026
Release: Dec 2, 2025
Premium
Access the largest public sector contact database
Close: Jan 6, 2026
Avenue will be expanded to 5 lanes on the north and south legs of the intersection including two-through lanes and a left-turn lane at the intersection in each direction. Street will be expanded to 4 lanes in the east and west directions including a left turn lane. The intersection will have new sidewalks and ADA-compliant curb ramps on each leg of the intersection. New traffic signals will be installed on each leg of the intersection as well. In addition, new pavement striping and signage will be installed. The project also includes the milling and overlaying improvements of existing asphalt pavement with portland cement concrete for improvements at the street and avenue intersection. The project includes new traffic signals at the intersection, new sidewalks, new pavement markings and signage.
AvailableThis project covers the installation of a traffic signal and other improvements at the intersection of Forestville Road.
Posted Date
Nov 6, 2025
Due Date
Dec 17, 2025
Release: Nov 6, 2025
Close: Dec 17, 2025
This project covers the installation of a traffic signal and other improvements at the intersection of Forestville Road.
AvailableThe City of Monroe, LA issued an Invitation for Bids titled 'Water System Improvements - Thomas Avenue / Georgia Street Intersection' to construct water distribution improvements at the Thomas Ave / Georgia St intersection. The Bid Banana listing and multiple buyer/marketplace sources show the opportunity opened on 2025-12-08 and closes on 2026-01-08, with bids due January 8, 2026 (bid reception listed at 1:45 PM local time). Contract documents are distributed through the City’s purchasing resources and Volkert Engineering / QuestCDN (Quest posting is password-protected), and the solicitation is a construction procurement (not a grant).
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
The City of Monroe, LA issued an Invitation for Bids titled 'Water System Improvements - Thomas Avenue / Georgia Street Intersection' to construct water distribution improvements at the Thomas Ave / Georgia St intersection. The Bid Banana listing and multiple buyer/marketplace sources show the opportunity opened on 2025-12-08 and closes on 2026-01-08, with bids due January 8, 2026 (bid reception listed at 1:45 PM local time). Contract documents are distributed through the City’s purchasing resources and Volkert Engineering / QuestCDN (Quest posting is password-protected), and the solicitation is a construction procurement (not a grant).
Available81 LF - 18" DR11 HDPE (open cut); 224 LF - 18" DR11 HDPE (directional boring); 145 LF - 18" DR11 HDPE (jack and bore); 8 LF - 8" DR25 C-900 PVC (open cut); 35 LF - 4" DR25 C-900 PVC (jack and bore); 1 ea - 10" gate valve, box and concrete pad.
Posted Date
Dec 8, 2025
Due Date
Jan 8, 2026
Release: Dec 8, 2025
Close: Jan 8, 2026
81 LF - 18" DR11 HDPE (open cut); 224 LF - 18" DR11 HDPE (directional boring); 145 LF - 18" DR11 HDPE (jack and bore); 8 LF - 8" DR25 C-900 PVC (open cut); 35 LF - 4" DR25 C-900 PVC (jack and bore); 1 ea - 10" gate valve, box and concrete pad.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis