OtherFL
Posted
Oct 29, 2026
Dec 1, 2026
Project Management Services - Request for Proposals
Provide part-time construction project manager/owners representative services.
Description: Work consists of in-water construction and demolition, new and refurbished structures, extension and relocation of utilities, acceptance and final placement final placement of the WETA standard float.
SpecialDistrict · CA, US
Adjacent opportunities open for bidding right now.
OtherFL
Posted
Oct 29, 2026
Dec 1, 2026
Provide part-time construction project manager/owners representative services.
CityCA
Posted
Sep 2, 2026
Nov 30, 2026
Provide two mobile substations.
Posted
-
Dec 31, 2099
The Brunswick Housing Authority seeks proposals from property owners to participate in the Section 8 Project-Based Voucher (PBV) Program, providing rental housing for low-income tenants under a Housing Assistance Payments (HAP) Contract.
CityNC
Posted
-
Dec 2, 2026
Project is to replace twenty-three (23) existing shingle roofs at various town-owned building locations. In addition, there would be possibly three (3) shingle roofs and one (1) single-ply membrane roof to be replaced if additional funding.
Decision makers connected to this RFP from San Francisco Bay Area Water Emergency Transportation Authority.
From the first pre-RFP signals to the published RFP and its files.
Board meeting
WETA staff were progressing permitting and project design for the Vallejo Dredging and Terminal Reconfiguration Project in preparation for a design-build construction RFP in FY2025/26.
Vallejo Dredging and Terminal Reconfiguration -- The project entails reconfiguration of the existing ferry terminal, including replacement of gangway, bridge/fixed pier and passenger float. The CEQA Initial Study/Mitigated Negative Declaration (IS/MND) was adopted by the Board in July 2024. The FTA is engaged to complete review of the Project in…
San Francisco Bay Area Water Emergency Transportation Authority Board of Directors Meeting
Board meeting · Jun 10, 2025
Vallejo Terminal Reconfiguration -- The reconfiguration of the Vallejo terminal is designed to save millions of operating dollars in the coming years by avoiding ongoing dredging at that site. The project will include replacement of gangway, bridge/fixed pier and passenger float. This project will relocate the float further away from the shore and to…
Board Of Directors Board Of Directors Meeting
Agenda packet · Jun 11, 2026
Vallejo Terminal Reconfiguration -- The reconfiguration of the Vallejo terminal is designed to save millions of operating dollars in the coming years by avoiding ongoing dredging at that site. The project will include replacement of gangway, bridge/fixed pier and passenger float. This project will relocate the float further away from the shore and to…
San Francisco Bay Area Water Emergency Transportation Authority Final Budget 2026-2027
Capital improvement plan · 2026
Board meeting
The Board approved exercising JT Marine's option for a structural third float for the Vallejo Terminal Reconfiguration Project at an additional cost of $6,160,000.
7. APPROVE AMENDMENT NO. 1 TO AGREEMENT 24-007 WITH JT MARINE TO EXERCISE OPTION FOR THIRD UNIVERSAL CHARGING FLOAT Senior Project Manager Jan Rybka presented the request for authorization to exercise the option for a third float under Agreement 24-007 with JT Marine, at an additional cost of $6,160,000. Mr. Rybka explained that the option float would be…
Agenda packet
The Executive Director proposed increasing the Vallejo Terminal Reconfiguration budget by $5.3 million for new scope and a new float in the FY2026/27 budget.
AGENDA ITEM 8 MEETING: June 11, 2026 MEMORANDUM TO: Board Members FROM: Seamus Murphy, Executive Director Lauren Gradia, Chief Financial Officer SUBJECT: Approve Proposed Fiscal Year 2026/27 Budget and Salary Schedule and Related Resolutions Recommendation The Executive Director recommends that the Board approve FY 2026/27 SF Bay Ferry Budget and Salary…
Board meeting
WETA staff reported that Vallejo environmental and permitting work was nearing completion, passenger-float fabrication was underway, and the terminal-reconfiguration RFP was expected within the next week.
At Valleo, environmental and permitting work is nearing completion. Passenger float fabrication is underway at JT Marine and we expect to release the terminal reconfiguration RFP within the
Weta Board Of Directors Board Meeting
Board meeting · Sep 25, 2026
RFP published
Proposals due (6 days left)
Water Emergency Transportation Authority Board Of Directors Board Of Directors Meeting
Board meeting · May 14, 2026
Board Of Directors Board Of Directors Meeting
Agenda packet · Jun 11, 2026