Summary
Coordination with OWNER to maintain full operation of the plant during construction including bypass pumping while maintaining complete chlorination and dichlorination of effluent; selective demolition of existing chlorination equipment; structural demolition and modifications to existing chlorine contact tank including platforming, grating, and handrails; installation of new drain line inside tank including piping and valving; installation of equipment including UV disinfection system, disc filter system, davit crane, and sluice gates; installation of electric actuators for existing yard valves; relocation of yard piping if and where directed; installation of new tank canopy including foundations; all electrical work including power and controls; testing and system startup; site cleaning and restoration; and contract closeout documentation.