The University Of Tennessee System
Higher EducationTN
Posted
Nov 24, 2026
Dec 11, 2026
Description: Quad Systems ADA Door Equipment
HigherEducation · TN, US
Decision makers connected to this RFP from The University Of Tennessee System.
Adjacent opportunities open for bidding right now.
The University Of Tennessee System
Higher EducationTN
Posted
Nov 24, 2026
Dec 11, 2026
The University of Tennessee is soliciting quotations for Quad Systems ADA Door Equipment. The official posting identifies it as RFQ BID1000356 and provides a brief synopsis using the same equipment description. The entry shows two attachments associated with the active solicitation.
StateNV
Posted
Nov 23, 2026
Dec 9, 2026
The State of Nevada, Office of the Military, seeks qualified contractors to furnish and install ADA-compliant automatic doors at the main front entrance of the OTAG office in Carson City. Work includes removing existing doors and hardware, installing commercial-grade aluminum storefront doors with low-energy automatic operators, and integrating electrical controls and existing security systems. The contractor must also provide weather-tight finishes, complete system testing and calibration, and train facility staff.
StateNV
Posted
Nov 23, 2026
Dec 9, 2026
The State of Nevada, Office of the Military, is seeking bids/proposals from qualified contractors to provide and furnish and install Americans with Disabilities Act (ADA) compliant automatic doors at the main front entrance of the Combined Support Maintenance Shop (CSMS) located in Carson City, Nevada The State of Nevada, Office of the Military, is seeking bids/proposals from qualified contractors to provide and furnish and install Americans with Disabilities Act (ADA) compliant automatic doors at the main front entrance of the Combined Support Maintenance Shop (CSMS) located in Carson City, Nevada Scope: The project scope includes, but is not limited to, the following components: * Removal & Disposal: Safely remove and dispose of existing manual storefront door hardware/doors as specified in the technical drawings. * ADA Installation: Install new commercial-grade aluminum storefront doors equipped with fully automatic, low-energy operators compliant with ADA and ANSI A156.19 standards. * Electrical & Controls: Run necessary electrical wiring from the nearest electrical panel to power the operators. Install interior and exterior wireless or hardwired ADA push-plate actuators and existing card readers. * Integration: Ensure the new door operators integrate seamlessly with the facility's existing access control and security systems. * Finishes & Seals: Provide appropriate weather-stripping, thresholds, and trim work to ensure a secure, weather-tight finish. * Testing & Certification: Perform complete system testing, calibration, and provide operational training to facility staff upon completion.
Special DistrictMA
Posted
Mar 18, 2026
Dec 2, 2026
Install web based access control and power door opener system at 14 residential tenant buildings and one community building (access only).
From the first pre-RFP signals to the published RFP and its files.
Board meeting
511 days before RFP
UT Knoxville proposed a facilities-fee increase to support deferred maintenance of existing campus buildings and supplement construction costs.
UT Knoxville Proposed 2025-26 Tuition and Fees C-6 UT Knoxville recommends no change in tuition for 2025-26; increasing facilities, transportation and library fees for the Knoxville Campuses; adding or increasing eight professional and executive program fees; increasing, decreasing or creating select course fees in the colleges of Arts & Science,…
The University of Tennessee Board of Trustees Annual Meeting
Board meeting · Jul 1, 2025
Proposed Uses: Replacement and improvement of student housing facilities and services $ 3,559,448 Food service operating inflation and salary adjustments 3,026,989 Funding deferred maintenance for existing campus buildings and to supplement the cost of construction for new buildings. 1,292,985
The University of Tennessee FY2025-26 Proposed Budget
Proposed budget · Jul 1, 2025
RFP published
Proposals due (14 days left)