Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work included for this project shall consist of removing existing small grinder pumps from existing small pump stations and replacing with new pumps in the existing structures. Work shall include re-connecting wiring to existing pump control panels and in some cases replacement of said control panels with new ones.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Replace the existing pneumatic ejector with a new electric duplex grinder pump station at the power plant for the electric department. The city municipal electric power plant has a pneumatic ejector station in the basement to handle sewer waste from its four staff bathrooms and locker rooms. This system was installed during the original plant construction in the 1960s and has reached the end of its service life. This project will replace the existing pneumatic ejector with a new electric duplex grinder pump station in the power plant basement.
Posted Date
Jan 5, 2026
Due Date
Jan 21, 2026
Release: Jan 5, 2026
Close: Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace the existing pneumatic ejector with a new electric duplex grinder pump station at the power plant for the electric department. The city municipal electric power plant has a pneumatic ejector station in the basement to handle sewer waste from its four staff bathrooms and locker rooms. This system was installed during the original plant construction in the 1960s and has reached the end of its service life. This project will replace the existing pneumatic ejector with a new electric duplex grinder pump station in the power plant basement.
AvailableThe City of Saline, Michigan is soliciting bids for sewer reconstruction work at City Hall, including installation of a grinder pump and associated improvements. The opportunity is posted on the MITN Purchasing Group (BidNet Direct) with a publication date of January 6, 2026 and a bid closing on January 27, 2026 at 2:00 PM EST. Full specifications and documents are available to registered vendors on the MITN platform.
Posted Date
-
Due Date
Jan 27, 2026
Close: Jan 27, 2026
The City of Saline, Michigan is soliciting bids for sewer reconstruction work at City Hall, including installation of a grinder pump and associated improvements. The opportunity is posted on the MITN Purchasing Group (BidNet Direct) with a publication date of January 6, 2026 and a bid closing on January 27, 2026 at 2:00 PM EST. Full specifications and documents are available to registered vendors on the MITN platform.
AvailableWork includes roof replacement and roof/strap retrofitting.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
Work includes roof replacement and roof/strap retrofitting.
AvailableWork includes doors replacement.
Posted Date
Nov 24, 2025
Due Date
Jan 12, 2026
Release: Nov 24, 2025
Close: Jan 12, 2026
Work includes doors replacement.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →