Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Works include approx. 1 LS Sanitary Service Lead, Abandon; 1 EA Sanitary Manhole, Interior Drop Connection; 1 LS Grinder Pump, Complete. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work included for this project shall consist of removing existing small grinder pumps from existing small pump stations and replacing with new pumps in the existing structures. Work shall include re-connecting wiring to existing pump control panels and in some cases replacement of said control panels with new ones.
Posted Date
Dec 26, 2025
Due Date
Jan 30, 2026
Release: Dec 26, 2025
Close: Jan 30, 2026
Work included for this project shall consist of removing existing small grinder pumps from existing small pump stations and replacing with new pumps in the existing structures. Work shall include re-connecting wiring to existing pump control panels and in some cases replacement of said control panels with new ones.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace the existing pneumatic ejector with a new electric duplex grinder pump station at the power plant for the electric department. The city municipal electric power plant has a pneumatic ejector station in the basement to handle sewer waste from its four staff bathrooms and locker rooms. This system was installed during the original plant construction in the 1960s and has reached the end of its service life. This project will replace the existing pneumatic ejector with a new electric duplex grinder pump station in the power plant basement.
Posted Date
Jan 5, 2026
Due Date
Jan 21, 2026
Release: Jan 5, 2026
Close: Jan 21, 2026
Replace the existing pneumatic ejector with a new electric duplex grinder pump station at the power plant for the electric department. The city municipal electric power plant has a pneumatic ejector station in the basement to handle sewer waste from its four staff bathrooms and locker rooms. This system was installed during the original plant construction in the 1960s and has reached the end of its service life. This project will replace the existing pneumatic ejector with a new electric duplex grinder pump station in the power plant basement.
AvailableOn-call emergency sewer system reconstruction and point repairs includes but is not limited to: cleaning, televising, and point repair of sanitary sewer pipes at various locations; reconstruction of manhole channel; removal and reconstruction of manhole; adjustment to grade of manhole frame and covers; and miscellaneous appurtenant work.
Posted Date
Dec 18, 2025
Due Date
Jan 15, 2026
Release: Dec 18, 2025
Close: Jan 15, 2026
On-call emergency sewer system reconstruction and point repairs includes but is not limited to: cleaning, televising, and point repair of sanitary sewer pipes at various locations; reconstruction of manhole channel; removal and reconstruction of manhole; adjustment to grade of manhole frame and covers; and miscellaneous appurtenant work.
AvailableReplacement of the fire pump and fire pump controller, including demolition and installation of new components, in Vodra Hall.
Posted Date
Jan 6, 2026
Due Date
Jan 23, 2026
Release: Jan 6, 2026
Close: Jan 23, 2026
Replacement of the fire pump and fire pump controller, including demolition and installation of new components, in Vodra Hall.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →