FederalCA
Posted
Aug 31, 2026
Sep 18, 2026
Galley Renovation at USCG Station Lake Tahoe RFP
The current galley facility requires modernization to enhance functionality and replace aging components. The existing layout, cabinetry, countertops, and specific appliances are outdated and do not meet the current operational needs of the crew. Safely disconnect plumbing, gas, and electrical from fixtures designated for removal. Demolish and remove all existing cabinetry, countertops, the old sink, the old griddle, and the existing freezer unit. Furnish and install new commercial-grade base, tall, and wall cabinets as per the approved layout. Furnish and install new, durable stainless-steel countertops. Install a new commercial-grade sink and faucet assembly, including all necessary plumbing connections.