Gate-Repair C-Lot Pump Station-Shu - (Request for Quotation)
The contractor shall provide all labor, parts, tools, equipment, materials, and supervision required to complete the sewer pump station repair, including but not limited to: Removing existing pumps, rails, and floats, as well as interconnecting pipe/fittings/valves to the penetration at the lift station sidewall and electrical/controls wires back to the existing panel(s). Existing pumps will be turned over to the Park. Coordination and communication with the Park Staff throughout the project. Contractor shall plug the two inlets of C-Lot Pump station. Contractor shall pump out the two solid holding tanks at the park, located at Fee Building and B-Lot). These two tanks are estimated to have a capacity of 12,000 gallons. This will give the Park capacity to continue to operate the restrooms in the Fee Building and at B-Lot. All collected wastewater and solids from Fee and B-Lot shall be properly disposed of offsite. See attached file.