Roadway Reconstruction-Cedar Drive, Oak Drive, Elm Drive, and Lea Drive RFP
Provide all labor, equipment and material necessary to construct the project known as roadway reconstruction.
Description: The City of Sugar Land seeks a contractor to furnish labor, materials, equipment, supervision, permits, and incidentals to install two 24-inch steel utility casings by trenchless methods at the US 90A and John Sharp Drive/Owens Road intersection. The work covers approximately 360 linear feet of casing for a future water line and approximately 303 linear feet for a future wastewater force main. The actual water line and force-main pipes are excluded from this open construction ITB, which is not a grant program.
City · TX, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of Sugar Land.
Adjacent opportunities open for bidding right now.
CityIL
Posted
Sep 20, 2026
Oct 14, 2026
Provide all labor, equipment and material necessary to construct the project known as roadway reconstruction.
Arizona Department of Transportation
State AgencyAZ
Posted
Jun 24, 2026
Oct 2, 2026
The Arizona Department of Transportation (ADOT) is soliciting bids to remove and replace a Dynamic Message Sign (DMS) on US-93 at Bonanza Drive on the Hoover Dam–Kingman Highway (mileposts ~27.3–27.6). Work includes removing the existing DMS north of Bonanza Drive and installing a new DMS south of the intersection, plus removal/installation of ITS cabinets and equipment, a new CCTV camera, load center, and construction of a maintenance pad to service the new DMS. ADOT published the advertisement on 2026-06-24 and the public bid opening is scheduled for 2026-10-02 at 11:00 AM (Arizona); the project program budget is listed at $1,000,000.
CityOR
Posted
Sep 11, 2026
Oct 14, 2026
Schedule 1: Ocean View Boardwalk: The work includes the construction of approximately 1,982 SF of synthetic lumber boardwalk along Ocean View Drive and the installation of 23 concrete/post footings, approximately 180 LF of concrete spread footings, 366 LF of type C curb with integral ledger, 650 SF 4” concrete sidewalk, approximately 110 LF 12” storm drain, installation of 3 storm drain structures, and approximately 400 LF handrail with downcast lighting. Schedule 2: Utility Undergrounding. This work includes converting the existing overhead utility service connection to a buried service for the Yachats Underground Pub and Grub located at 125 Ocean View Drive, installing a CLPUD street light base and a new meter can and load center on the SW corner of Hwy 101 and Ocean View drive for the new boardwalk. This work includes directional drilling of approximately 52 LF of 2” electrical conduit below Beach Street, directional drilling of approximately 101 LF of 2” electrical conduit below Hwy 101, installation of CLPUD transformer base, installation of CLPUD pull box, installation of approximately 250 2” SCH40 PVC conduit by open trench methods, installation of all conductors, and coordination with CLPUD and property owner for service conversion.
CityOR
Posted
Sep 11, 2026
Oct 14, 2026
Schedule 1: Ocean View Boardwalk: The work includes the construction of approximately 1,982 SF of synthetic lumber boardwalk along Ocean View Drive and the installation of 23 concrete/post footings, approximately 180 LF of concrete spread footings, 366 LF of type C curb with integral ledger, 650 SF 4” concrete sidewalk, approximately 110 LF 12” storm drain, installation of 3 storm drain structures, and approximately 400 LF handrail with downcast lighting. Schedule 2: Utility Undergrounding. This work includes converting the existing overhead utility service connection to a buried service for the Yachats Underground Pub and Grub located at 125 Ocean View Drive, installing a CLPUD street light base and a new meter can and load center on the SW corner of Hwy 101 and Ocean View drive for the new boardwalk. This work includes directional drilling of approximately 52 LF of 2” electrical conduit below Beach Street, directional drilling of approximately 101 LF of 2” electrical conduit below Hwy 101, installation of CLPUD transformer base, installation of CLPUD pull box, installation of approximately 250 2” SCH40 PVC conduit by open trench methods, installation of all conductors, and coordination with CLPUD and property owner for service conversion.