Santa Clara Valley Transportation Authority
Special DistrictCA
Posted
Sep 21, 2026
Nov 12, 2026
US 101 Express Lanes Phase 5
Work includes construct a new 2nd express lane to create a dual express lane system.
Description: Trucking, Temporary and Permanent Hydroseed and Erosion Control Measures, QC/QA Testing, Crash Cushion, Crack Monitoring, Vibration Monitoring, Construction Staking, Lead Compliance Plan, Develop Water Supply, Construction Area Signs, Traffic Control System, Type III Barricade, Delineators, Portable Radar Speed Feedback Sign, Temporary Barrier System, Portable Changeable Message Sign, SWPPP, Sweeping, ADL Burial Location Report, Treated Wood Waste, Temporary High-Visibility Fence, Clearing & Grubbing, Dust Palliative, Roadway Excavation (Aerially Deposited Lead), Structure Excavation, Structure Backfill, Subgrade Enhancement Geogrid, Crack & Seat, Prime Coat, AC Dike, Geosynthetic Pavement Interlayer, Tack Coat, Cold Plane AC, Spall Repair, Grinding, Soil Nail, CIDH Concrete Pile, Structure Concrete, Structural Concrete, Minor Concrete, Bar Reinforcing Steel, Structure Shotcrete, Sign Structure, Guard Post, Concrete Backfill, Trash Net, Underground, Abandon Culvert, Abandon Sewer, Adjust Inlet, Sand Backfill, Rock Slope Protection, Minor Concrete, Misc. Iron & Steel, Toll Infrastructure, Sanitary Sewer, Sewer Manhole, Prepare and Paint Concrete, Fencing, Pavement Marker, Roadside Signs, Guardrail Systems, Crash Cushion, Concrete Barrier, Striping & Marking, Rumble Strip, Maintain Existing Traffic Management System Elements During Construction, Electrical, and Construction Materials
SpecialDistrict · CA, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalAdjacent opportunities open for bidding right now.
Santa Clara Valley Transportation Authority
Special DistrictCA
Posted
Sep 21, 2026
Nov 12, 2026
Work includes construct a new 2nd express lane to create a dual express lane system.
San Bernardino County Transportation Authority
Special DistrictCA
Posted
Sep 23, 2026
Oct 22, 2026
San Bernardino County Transportation Authority is seeking bids to supply channelizers for the southbound SB Express Lanes. The channelizers will separate the express lanes from general-purpose lanes and prevent drivers without accounts from using them without payment. Electronic bids are due October 22, 2026, at 2:00 PM PDT; detailed requirements and submission instructions are in the IFB.
School DistrictFL
Posted
Sep 27, 2026
Oct 29, 2026
Work includes but is not limited to: cleaning, roofing, drywall, stucco, flooring, acoustical ceilings, toilet accessories, signage, lockers, walkway covers, display boards, food service, athletic equipment, stage curtains, blinds, casework, playgrounds, HVAC, electrical, low voltage, site improvements, fencing, landscaping, irrigation, play fields.
CityMI
Posted
Sep 25, 2026
Oct 27, 2026
The City seeks bids for a half-mile infrastructure reconstruction project. The stated scope includes water-main work, sanitary/storm sewer replacement, and roadway rehabilitation from Meredith Street to Janes. The posting identifies the project as Medical Diamond Infrastructure Phase 1 & 3, bid C-1730.
Decision makers connected to this RFP from Santa Clara Valley Transportation Authority.