Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seattle Public Schools is requesting proposals to remove the existing Uninterruptible Power Supply (UPS) system and furnish, install, and commission a new UPS system at the John Stanford Center for Educational Excellence (JSCEE). A virtual pre-proposal meeting is noted for January 26 at 11:00 a.m. with Teams and dial-in details provided on the posting. Proposals are due February 10, 2026 at 10:00 a.m. Pacific Time.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Seattle Public Schools seeks a GC/CM to provide preconstruction and construction services for the Bryant Elementary School Windows Improvements project funded by the BEX V and BTA V capital levies. The scope includes exterior faade repairs and cleaning, wood window repairs, and replacement of failing aluminum-clad wood windows with associated moisture-intrusion wall repairs. A virtual pre-proposal meeting and an on-site visit are scheduled for December 17, and proposals are due January 20, 2026 at 10:00 a.m. PST.
Posted Date
Dec 5, 2025
Due Date
Jan 20, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Close: Jan 20, 2026
Seattle Public Schools seeks a GC/CM to provide preconstruction and construction services for the Bryant Elementary School Windows Improvements project funded by the BEX V and BTA V capital levies. The scope includes exterior faade repairs and cleaning, wood window repairs, and replacement of failing aluminum-clad wood windows with associated moisture-intrusion wall repairs. A virtual pre-proposal meeting and an on-site visit are scheduled for December 17, and proposals are due January 20, 2026 at 10:00 a.m. PST.
AvailableSeeking qualifications for Professional Architectural/Engineering Consultant Services for Seattle Animal Shelter Design.
Posted Date
Dec 11, 2025
Due Date
Feb 9, 2026
Release: Dec 11, 2025
Close: Feb 9, 2026
Seeking qualifications for Professional Architectural/Engineering Consultant Services for Seattle Animal Shelter Design.
AvailableThe Department of Veterans Affairs (Network Contract Office 20) issued a solicitation (36C26026Q0256) for UPS battery replacement and installation services at the Puget Sound VA Medical Center in Seattle, WA. The requirement is a total SDVOSB sole-source RFQ for procuring and installing two new UPS battery systems (40kW and 120kW), with a mandatory site visit scheduled and Service Contract Act wage determinations required. Questions are due Jan 14, 2026 and quotes must be emailed to the contracting POC by Jan 19, 2026 at 12:00 PM Pacific.
Posted Date
Jan 5, 2026
Due Date
Jan 19, 2026
Release: Jan 5, 2026
Close: Jan 19, 2026
The Department of Veterans Affairs (Network Contract Office 20) issued a solicitation (36C26026Q0256) for UPS battery replacement and installation services at the Puget Sound VA Medical Center in Seattle, WA. The requirement is a total SDVOSB sole-source RFQ for procuring and installing two new UPS battery systems (40kW and 120kW), with a mandatory site visit scheduled and Service Contract Act wage determinations required. Questions are due Jan 14, 2026 and quotes must be emailed to the contracting POC by Jan 19, 2026 at 12:00 PM Pacific.
AvailableThe 'CUP Cooling Tower Replacement' project involves replacing an existing cooling tower with a new one of similar capacity and footprint. This work is to be performed on the rooftop of the Central Utility Plant at Seattle Center, located at 324 Republican St., Seattle, WA 98109. The City of Seattle - Public Works is seeking proposals for this project, which has an estimated value of $1,700,000.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
The 'CUP Cooling Tower Replacement' project involves replacing an existing cooling tower with a new one of similar capacity and footprint. This work is to be performed on the rooftop of the Central Utility Plant at Seattle Center, located at 324 Republican St., Seattle, WA 98109. The City of Seattle - Public Works is seeking proposals for this project, which has an estimated value of $1,700,000.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →