Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Larned State Correctional Facility (State of Kansas) is soliciting bids to remove the existing UPS and install a new UPS system, including any necessary repairs or replacements of equipment; the facility will provide the UPS and breakers while the contractor is responsible for labor, materials, equipment not provided, safety, and required insurance. A mandatory pre-bid/site visit will be held on 2026-01-13 at 10:00 AM local time; questions are due 2026-01-20 and bids are due 2026-01-27 by 2:00 PM CST. The procurement contact is Ashley N. Evans, and the estimated budget range is $50,000–$200,000; full solicitation documents and submission instructions are available on the Kansas Supplier Portal event EVT0010634.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide UPS installation.
Posted Date
Dec 31, 2025
Due Date
Jan 27, 2026
Release: Dec 31, 2025
Close: Jan 27, 2026
Provide UPS installation.
AvailableThe Department of Veterans Affairs (Network Contract Office 20) issued a solicitation (36C26026Q0256) for UPS battery replacement and installation services at the Puget Sound VA Medical Center in Seattle, WA. The requirement is a total SDVOSB sole-source RFQ for procuring and installing two new UPS battery systems (40kW and 120kW), with a mandatory site visit scheduled and Service Contract Act wage determinations required. Questions are due Jan 14, 2026 and quotes must be emailed to the contracting POC by Jan 19, 2026 at 12:00 PM Pacific.
Posted Date
Jan 5, 2026
Due Date
Jan 19, 2026
Release: Jan 5, 2026
Close: Jan 19, 2026
The Department of Veterans Affairs (Network Contract Office 20) issued a solicitation (36C26026Q0256) for UPS battery replacement and installation services at the Puget Sound VA Medical Center in Seattle, WA. The requirement is a total SDVOSB sole-source RFQ for procuring and installing two new UPS battery systems (40kW and 120kW), with a mandatory site visit scheduled and Service Contract Act wage determinations required. Questions are due Jan 14, 2026 and quotes must be emailed to the contracting POC by Jan 19, 2026 at 12:00 PM Pacific.
Elk Grove Unified School District (EGUSD) issued RFP 815-25/26 to procure Uninterruptible Power Supply (UPS) hardware and installation services for Main Distribution Facilities (MDFs) and Intermediate Distribution Facilities (IDFs) at various district school sites. The opportunity is posted on the districts Bonfire portal, is listed as an RFP (not a grant), includes a mandatory pre-bidders/site-walk requirement Dec 1519, 2025, and requests multiple appendices and a complete RFP PDF packet. The solicitation is open (posted Dec 5, 2025) and closes Jan 16, 2026, with questions due Jan 2, 2026.
Posted Date
Dec 5, 2025
Due Date
Jan 17, 2026
Release: Dec 5, 2025
Close: Jan 17, 2026
Elk Grove Unified School District (EGUSD) issued RFP 815-25/26 to procure Uninterruptible Power Supply (UPS) hardware and installation services for Main Distribution Facilities (MDFs) and Intermediate Distribution Facilities (IDFs) at various district school sites. The opportunity is posted on the districts Bonfire portal, is listed as an RFP (not a grant), includes a mandatory pre-bidders/site-walk requirement Dec 1519, 2025, and requests multiple appendices and a complete RFP PDF packet. The solicitation is open (posted Dec 5, 2025) and closes Jan 16, 2026, with questions due Jan 2, 2026.
The Elk Grove Unified School District (EGUSD) is soliciting proposals to provide E-Rate eligible Uninterruptible Power Supply (UPS) equipment and installation for Main Distribution Facilities (MDFs) and Intermediate Distribution Facilities (IDFs) across multiple school sites to meet current and future scalability needs. The solicitation requires vendors to meet E-Rate program conditions (SPINs, FCC Green Light status) and California contractor/license and prevailing wage requirements; a mandatory pre-bidders conference with site walks is scheduled for Dec 15–19, 2025. Proposals must be submitted electronically through the EGUSD Bonfire portal by the stated close date and the opportunity is listed as Open (not a grant).
Posted Date
Dec 5, 2025
Due Date
Jan 17, 2026
Release: Dec 5, 2025
Close: Jan 17, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Elk Grove Unified School District (EGUSD) is soliciting proposals to provide E-Rate eligible Uninterruptible Power Supply (UPS) equipment and installation for Main Distribution Facilities (MDFs) and Intermediate Distribution Facilities (IDFs) across multiple school sites to meet current and future scalability needs. The solicitation requires vendors to meet E-Rate program conditions (SPINs, FCC Green Light status) and California contractor/license and prevailing wage requirements; a mandatory pre-bidders conference with site walks is scheduled for Dec 15–19, 2025. Proposals must be submitted electronically through the EGUSD Bonfire portal by the stated close date and the opportunity is listed as Open (not a grant).