Hydronic Pipe Replacement - Labor Only RFP
Posted
Aug 19, 2026
Sep 23, 2026
Winfield Correctional Facility is soliciting a Request for Quote for labor-only removal and replacement of hydronic piping on one floor of the Birch Building. The contractor must provide labor, supervision, tools, and equipment, while facility-provided Type A PEX piping and associated components are installed and the system is tested. This is a posted procurement event rather than a grant program, with bids due on September 23, 2026.
