Upper Mississippi River Restoration (umrr) Pool 12 Floodplain Forest Stage One (1) - Habitat Rehabilitation And Enhancement Project (hrep) RFP

Description: The project consists of ridge and swale construction to provide improved soil hydrology by manipulating existing ground in areas that are seasonally wet due to poor drainage and low elevation. The work includes, but is not limited to, stripping and temporarily stockpiling topsoil; excavation to create drainage swales with adjacent material placement to form ridges; replacement of stripped topsoil; and site restoration. Equipment access to the project is by barge only.

Released
Nov 2, 2026
Closes
Dec 2, 2026(27 days left)