Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The contract involves replacing the old router with a newer one, adding an extender or Mesh to the existing Wi-Fi network, and ensuring the seamless integration of the latest equipment with the current system. Contractor shall provide all needed labor, materials, Supervision, Quality and Safety Measures, and all other necessary resources required to update the patient Wi-Fi system. A. Building 1: 1. The contractor shall replace selected patient Wi-Fi access points, Firewall, Wi-Fi switches and install new directional antenna. a. First floor i. Replace ten (10) access points, two (2) consoles, four (4) switches, one (1) server, and one (1) firewall. b. Second floor i. Replace four (4) access points and one (1) switch. ii. Remove one (1) access point. iii. Add CAT6A cabling for the router in room 3239. c. Third floor i. The contractor shall install all the necessary wiring and one (1) directional Wi-Fi antenna on Building 1 outside room 3239. ii. Contractor shall install all equipment necessary to install a Wi-Fi router for the antenna outside room 3239. d. Fourth floor i. Replace eleven (11) access points and one (1) switch. B. Building 2: 1. The Contractor shall install one (1) Wi-Fi repeater on Building 2. 2. The Contractor shall install one (1) Wi-Fi router in Building 2 for the Wi-Fi repeater. 3. The Contractor shall install three (3) access points and all necessary wiring for the access points. C. Building 8: 1. The contractor shall install two (2) new access points in Building 8. This will include all wiring and equipment necessary to make the access points operational. 2. The Contractor shall install one (1) switch for the Wireless access points in Building 8. 3. The Contractor shall install one (1) omnidirectional antenna on Building 8. This antenna shall be placed on the exterior west facing wall of the building. 4. The Contractor shall install one (1) Wi-Fi router in Building 8 for the omnidirectional antenna. 5. The Contractor shall install racking in Building 8 for the switch. 6. Work in Building 8 Shall be performed during off hours, 5:00 P.M. 2:00 A.M. Monday Friday. D. Equipment List 1. Access points will be Ruckus R650 dual-band 802.11abgn/ac/ax Wireless Access Point with Multi-Gigabit Ethernet backhaul, 4x4:4 + 2x2:2 streams, OFDMA, MU-MIMO, BeamFlex+, dual ports, PoH/uPoE/802.3at PoE support or equivalent. 2. Switches will be ICX 7150 Switch, 24x 10/100/1000 PoE+ ports, 2x 1G RJ45 uplink-ports, 2x 1G SFP and 2x 10G SFP+ uplink-ports upgradable to 4x 10G SFP+ with license 370W PoE budget, basic L3 (static routing and RIP) or equivalent. 3. Transceivers will be 1000BASE-SX SFP optic, MMF, LC connector, Optical Monitoring Capable or equivalent. 4. Cabling will be CAT6A. 5. All materials sourced and installed shall be compatible with each other. E. Additional requirements. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provide commercial internet wifi service.
Posted Date
Aug 16, 2024
Due Date
Aug 16, 2029
Release: Aug 16, 2024
Close: Aug 16, 2029
Provide commercial internet wifi service.
AvailableProvide the three tasks in relation to the Patient Experience Survey.
Posted Date
Nov 25, 2025
Due Date
Jan 9, 2026
Release: Nov 25, 2025
Close: Jan 9, 2026
Provide the three tasks in relation to the Patient Experience Survey.
AvailableVA Direct To Patient Supply Services.
Posted Date
Dec 11, 2025
Due Date
Jan 11, 2026
Release: Dec 11, 2025
Close: Jan 11, 2026
VA Direct To Patient Supply Services.
AvailableProvide electronic payment services for patient billing.
Posted Date
Dec 5, 2025
Due Date
Jan 22, 2026
Release: Dec 5, 2025
Close: Jan 22, 2026
Provide electronic payment services for patient billing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis