Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide commercial internet wifi service.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
A requirement for commercial lodging that will encompass all military personnel stationed.
Posted Date
Nov 26, 2024
Due Date
Nov 26, 2029
Release: Nov 26, 2024
Close: Nov 26, 2029
A requirement for commercial lodging that will encompass all military personnel stationed.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Altamonte Springs in Seminole County, Florida, is pursuing a single-source procurement for consulting services with SFB Consulting, LLC. This solicitation, identified as SS25018RS, aims to waive the standard solicitation process. Responses are required to be submitted to Procurement Manager Roxana Siaca-Jones by 4:30 p.m. on January 3, 2026.
Posted Date
Dec 15, 2025
Due Date
Jan 3, 2026
Release: Dec 15, 2025
Close: Jan 3, 2026
The City of Altamonte Springs in Seminole County, Florida, is pursuing a single-source procurement for consulting services with SFB Consulting, LLC. This solicitation, identified as SS25018RS, aims to waive the standard solicitation process. Responses are required to be submitted to Procurement Manager Roxana Siaca-Jones by 4:30 p.m. on January 3, 2026.
AvailableProvide architectural and refrigeration upgrades including electrical upgrades and modifications, mechanical and plumbing improvements and modifications, restroom renovations, new led lighting. Modifications to prefabricated insulated coolers and freezers; floor finishes in various areas to include new ceramic tile in the restrooms, vct in the admin and entry areas and polished concrete in the main sales floor; wall finishes of paint; ceiling finishes of suspended acoustical panels and gypsum wallboard
Posted Date
Nov 25, 2025
Due Date
Jan 13, 2026
Release: Nov 25, 2025
Close: Jan 13, 2026
Provide architectural and refrigeration upgrades including electrical upgrades and modifications, mechanical and plumbing improvements and modifications, restroom renovations, new led lighting. Modifications to prefabricated insulated coolers and freezers; floor finishes in various areas to include new ceramic tile in the restrooms, vct in the admin and entry areas and polished concrete in the main sales floor; wall finishes of paint; ceiling finishes of suspended acoustical panels and gypsum wallboard
AvailableThe contract involves replacing the old router with a newer one, adding an extender or Mesh to the existing Wi-Fi network, and ensuring the seamless integration of the latest equipment with the current system. Contractor shall provide all needed labor, materials, Supervision, Quality and Safety Measures, and all other necessary resources required to update the patient Wi-Fi system. A. Building 1: 1. The contractor shall replace selected patient Wi-Fi access points, Firewall, Wi-Fi switches and install new directional antenna. a. First floor i. Replace ten (10) access points, two (2) consoles, four (4) switches, one (1) server, and one (1) firewall. b. Second floor i. Replace four (4) access points and one (1) switch. ii. Remove one (1) access point. iii. Add CAT6A cabling for the router in room 3239. c. Third floor i. The contractor shall install all the necessary wiring and one (1) directional Wi-Fi antenna on Building 1 outside room 3239. ii. Contractor shall install all equipment necessary to install a Wi-Fi router for the antenna outside room 3239. d. Fourth floor i. Replace eleven (11) access points and one (1) switch. B. Building 2: 1. The Contractor shall install one (1) Wi-Fi repeater on Building 2. 2. The Contractor shall install one (1) Wi-Fi router in Building 2 for the Wi-Fi repeater. 3. The Contractor shall install three (3) access points and all necessary wiring for the access points. C. Building 8: 1. The contractor shall install two (2) new access points in Building 8. This will include all wiring and equipment necessary to make the access points operational. 2. The Contractor shall install one (1) switch for the Wireless access points in Building 8. 3. The Contractor shall install one (1) omnidirectional antenna on Building 8. This antenna shall be placed on the exterior west facing wall of the building. 4. The Contractor shall install one (1) Wi-Fi router in Building 8 for the omnidirectional antenna. 5. The Contractor shall install racking in Building 8 for the switch. 6. Work in Building 8 Shall be performed during off hours, 5:00 P.M. 2:00 A.M. Monday Friday. D. Equipment List 1. Access points will be Ruckus R650 dual-band 802.11abgn/ac/ax Wireless Access Point with Multi-Gigabit Ethernet backhaul, 4x4:4 + 2x2:2 streams, OFDMA, MU-MIMO, BeamFlex+, dual ports, PoH/uPoE/802.3at PoE support or equivalent. 2. Switches will be ICX 7150 Switch, 24x 10/100/1000 PoE+ ports, 2x 1G RJ45 uplink-ports, 2x 1G SFP and 2x 10G SFP+ uplink-ports upgradable to 4x 10G SFP+ with license 370W PoE budget, basic L3 (static routing and RIP) or equivalent. 3. Transceivers will be 1000BASE-SX SFP optic, MMF, LC connector, Optical Monitoring Capable or equivalent. 4. Cabling will be CAT6A. 5. All materials sourced and installed shall be compatible with each other. E. Additional requirements. See attached file.
Posted Date
Nov 18, 2025
Due Date
Jan 7, 2026
Release: Nov 18, 2025
Close: Jan 7, 2026
The contract involves replacing the old router with a newer one, adding an extender or Mesh to the existing Wi-Fi network, and ensuring the seamless integration of the latest equipment with the current system. Contractor shall provide all needed labor, materials, Supervision, Quality and Safety Measures, and all other necessary resources required to update the patient Wi-Fi system. A. Building 1: 1. The contractor shall replace selected patient Wi-Fi access points, Firewall, Wi-Fi switches and install new directional antenna. a. First floor i. Replace ten (10) access points, two (2) consoles, four (4) switches, one (1) server, and one (1) firewall. b. Second floor i. Replace four (4) access points and one (1) switch. ii. Remove one (1) access point. iii. Add CAT6A cabling for the router in room 3239. c. Third floor i. The contractor shall install all the necessary wiring and one (1) directional Wi-Fi antenna on Building 1 outside room 3239. ii. Contractor shall install all equipment necessary to install a Wi-Fi router for the antenna outside room 3239. d. Fourth floor i. Replace eleven (11) access points and one (1) switch. B. Building 2: 1. The Contractor shall install one (1) Wi-Fi repeater on Building 2. 2. The Contractor shall install one (1) Wi-Fi router in Building 2 for the Wi-Fi repeater. 3. The Contractor shall install three (3) access points and all necessary wiring for the access points. C. Building 8: 1. The contractor shall install two (2) new access points in Building 8. This will include all wiring and equipment necessary to make the access points operational. 2. The Contractor shall install one (1) switch for the Wireless access points in Building 8. 3. The Contractor shall install one (1) omnidirectional antenna on Building 8. This antenna shall be placed on the exterior west facing wall of the building. 4. The Contractor shall install one (1) Wi-Fi router in Building 8 for the omnidirectional antenna. 5. The Contractor shall install racking in Building 8 for the switch. 6. Work in Building 8 Shall be performed during off hours, 5:00 P.M. 2:00 A.M. Monday Friday. D. Equipment List 1. Access points will be Ruckus R650 dual-band 802.11abgn/ac/ax Wireless Access Point with Multi-Gigabit Ethernet backhaul, 4x4:4 + 2x2:2 streams, OFDMA, MU-MIMO, BeamFlex+, dual ports, PoH/uPoE/802.3at PoE support or equivalent. 2. Switches will be ICX 7150 Switch, 24x 10/100/1000 PoE+ ports, 2x 1G RJ45 uplink-ports, 2x 1G SFP and 2x 10G SFP+ uplink-ports upgradable to 4x 10G SFP+ with license 370W PoE budget, basic L3 (static routing and RIP) or equivalent. 3. Transceivers will be 1000BASE-SX SFP optic, MMF, LC connector, Optical Monitoring Capable or equivalent. 4. Cabling will be CAT6A. 5. All materials sourced and installed shall be compatible with each other. E. Additional requirements. See attached file.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →