Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Synthesizing live web signals with exclusive contracts, FOIA docs, and board-level intelligence.
Ask a question to get started or click a suggestion below.
Search across Nevada Division of State Parks's meeting minutes, FOIA documents, procurement records, and public filings. Our AI reads thousands of sources so you don't have to.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
Active opportunities open for bidding
Nevada Division of State Parks
The work includes; installation of 10" throttle valves, 6" SCH 40 steel water line, 6" SCH 40 PVC water line, 6" throttle valve, 2" electrical conduit, and 4" C900 PVC fire supply line, along with construction of a fire suppression pump building with water storage tank and appurtenances. Scope also includes providing and installing interior fire suppression lines, sprinkler heads, and all associated appurtenances
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Release: Dec 11, 2025
Nevada Division of State Parks
Close: Jan 15, 2026
The work includes; installation of 10" throttle valves, 6" SCH 40 steel water line, 6" SCH 40 PVC water line, 6" throttle valve, 2" electrical conduit, and 4" C900 PVC fire supply line, along with construction of a fire suppression pump building with water storage tank and appurtenances. Scope also includes providing and installing interior fire suppression lines, sprinkler heads, and all associated appurtenances
AvailableNevada Division of State Parks
The work under this contract shall include the construction of a pier and concrete boat ramp, as well as necessary earthwork and trail approaches to these elements, as described in the project documents entitled “SPOONER FRONTCOUNTRY IMPROVEMENTS PHASE 3 AT SPOONER LAKE STATE PARK, DOUGLAS COUNTY, NEVADA .” Other associated or incidental work as shown or specified in the Contract Drawings and specifications.
Posted Date
Dec 11, 2025
Due Date
Jan 13, 2026
Release: Dec 11, 2025
Nevada Division of State Parks
Close: Jan 13, 2026
The work under this contract shall include the construction of a pier and concrete boat ramp, as well as necessary earthwork and trail approaches to these elements, as described in the project documents entitled “SPOONER FRONTCOUNTRY IMPROVEMENTS PHASE 3 AT SPOONER LAKE STATE PARK, DOUGLAS COUNTY, NEVADA .” Other associated or incidental work as shown or specified in the Contract Drawings and specifications.
AvailableNevada Division of State Parks
Construction of a pier and concrete boat ramp, as well as necessary earthwork and trail approaches to these elements.
Posted Date
Nov 6, 2025
Due Date
Dec 9, 2025
Release: Nov 6, 2025
Nevada Division of State Parks
Close: Dec 9, 2025
Construction of a pier and concrete boat ramp, as well as necessary earthwork and trail approaches to these elements.
Get alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.