Discover opportunities months before the RFP drops
Learn more →Key metrics and characteristics
The city where this buyer is located.
The county where this buyer is located.
Physical address of this buyer.
Contact phone number for this buyer.
Postal code for this buyer's location.
How likely this buyer is to spend on new technology based on operating budget trends.
How likely this buyer is to adopt new AI technologies.
How often this buyer champions startups and early adoption.
Includes fiscal year calendars, procurement complexity scores, and strategic insights.
Active opportunities open for bidding
Nevada Division of State Parks
Nevada State Public Works Division (SPWD) is soliciting bids for removal and replacement of concrete walk paths and adjacent ramps at the Nevada Supreme Court in Carson City. The contract term is 90 calendar days, liquidated damages are $465.00 per calendar day for delays, and prevailing wages apply. Bids are due May 27, 2026, and the project was officially posted on May 22, 2026.
Posted Date
May 22, 2026
Due Date
May 27, 2026
Release: May 22, 2026
Nevada Division of State Parks
Close: May 27, 2026
Nevada State Public Works Division (SPWD) is soliciting bids for removal and replacement of concrete walk paths and adjacent ramps at the Nevada Supreme Court in Carson City. The contract term is 90 calendar days, liquidated damages are $465.00 per calendar day for delays, and prevailing wages apply. Bids are due May 27, 2026, and the project was officially posted on May 22, 2026.
Nevada Division of State Parks
The contractor will repair the shop building according to the set of plans produced saving all historic elements possible so the park can have a functioning blacksmith shop once again. Project includes bringing building up to current code requirements.
Posted Date
May 5, 2026
Due Date
May 28, 2026
Release: May 5, 2026
Nevada Division of State Parks
Close: May 28, 2026
The contractor will repair the shop building according to the set of plans produced saving all historic elements possible so the park can have a functioning blacksmith shop once again. Project includes bringing building up to current code requirements.
Nevada Division of State Parks
Project includes the fabrication of two boat docks at state park in the exact configuration and dimensions as the docks recently removed due to storm damage. Each boat dock consists of three floating dock sections which are 23' long x 6' wide. The new floating docks will fabricated and installed using the existing pilings and must be connected to the existing stationary wood docks at the shoreline. New decking will be installed on the existing stationary wood docks to match the replacement dock sections.
Posted Date
May 2, 2026
Due Date
Jun 2, 2026
Release: May 2, 2026
Nevada Division of State Parks
Close: Jun 2, 2026
Project includes the fabrication of two boat docks at state park in the exact configuration and dimensions as the docks recently removed due to storm damage. Each boat dock consists of three floating dock sections which are 23' long x 6' wide. The new floating docks will fabricated and installed using the existing pilings and must be connected to the existing stationary wood docks at the shoreline. New decking will be installed on the existing stationary wood docks to match the replacement dock sections.
AvailableGet alerted before the bid drops, know which RFPs to pursue, and generate compliant drafts with AI.
Keep your public sector contacts fresh and actionable. No more stale data.
Premium
Win more deals with deep buyer insights
Premium
Access the largest public sector contact database
© 2026 Starbridge