Summary
Penn State’s Office of Physical Plant seeks bids for Phase II of the White Course project to replace existing EPDM roofs with new 30-year PVC (KEE) systems, add new aluminum gutters/downspouts, and upgrade HVAC equipment and associated piping/ductwork at Grubb and Garban Halls. The work also includes replacing roof drains and providing electrical power to the new HVAC equipment, with an alternate for installing roof fall protection. Bids are submitted electronically via the Trimble Unity Construct Bid Portal; a pre‑bid is scheduled for 02/09/2026 at 1:00 pm, and bids are due 02/17/2026 at 3:00 pm (ET).