Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Floodplain restoration. Including 4" manhole with lid; storm sewer installation (18" HDPE); straw mulch; permanent seeding; landscape planting.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking the services of a qualified contractor with experience in floodplain restoration and/or related experience to carry out the Scope of Work outlined in this bid. This project will restore riparian habitat and floodplain access at the Dorothy Smith Access Area by reducing impervious surface along the parking lot, removing gravel built up on the floodplain, re-vegetating the floodplain, and maintaining river access via a walking path. This project will provide floodplain access, enhance flood resiliency, and reduce sedimentation and stormwater runoff into the Lamoille River. The Access Area is located upstream of the confluence with the Brewster River. This site has historically experienced streambank erosion, sedimentation, and nutrient loading, especially near the Fishing Access Area. This site was identified as a priority in the 2021 Cambridge Stormwater Master Plan and recognized as an erosion hot spot. Floodplain restoration on this Vermont Fish and Wildlife parcel will provide storage for flood water, ice, and debris. Located immediately upstream of the Route 108 bridge, this parcel provides a crucial location for ice, debris, and sediment to settle out, to reduce sedimentation inputs into the Lamoille and Brewster River.
Posted Date
Jan 8, 2026
Due Date
Feb 13, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Jan 8, 2026
Close: Feb 13, 2026
Seeking the services of a qualified contractor with experience in floodplain restoration and/or related experience to carry out the Scope of Work outlined in this bid. This project will restore riparian habitat and floodplain access at the Dorothy Smith Access Area by reducing impervious surface along the parking lot, removing gravel built up on the floodplain, re-vegetating the floodplain, and maintaining river access via a walking path. This project will provide floodplain access, enhance flood resiliency, and reduce sedimentation and stormwater runoff into the Lamoille River. The Access Area is located upstream of the confluence with the Brewster River. This site has historically experienced streambank erosion, sedimentation, and nutrient loading, especially near the Fishing Access Area. This site was identified as a priority in the 2021 Cambridge Stormwater Master Plan and recognized as an erosion hot spot. Floodplain restoration on this Vermont Fish and Wildlife parcel will provide storage for flood water, ice, and debris. Located immediately upstream of the Route 108 bridge, this parcel provides a crucial location for ice, debris, and sediment to settle out, to reduce sedimentation inputs into the Lamoille and Brewster River.
AvailableWork includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
Posted Date
Dec 11, 2025
Due Date
Jan 22, 2026
Release: Dec 11, 2025
Close: Jan 22, 2026
Work includes 1875 LF of stream restoration including excavation, grading, slope stabilization fabric, erosion and sedimentation controls, landscape restoration, vegetated coir log, riparian buffer plants, replacement of existing retaining wall, and all necessary appurtenances and restoration for said construction.
AvailableProcurement of a qualified contractor to perform restoration of stone masonry wingwalls and embankment erosion along Rock Run.
Posted Date
Dec 1, 2025
Due Date
Feb 17, 2026
Release: Dec 1, 2025
Close: Feb 17, 2026
Procurement of a qualified contractor to perform restoration of stone masonry wingwalls and embankment erosion along Rock Run.
AvailableDESIGN-BUILD services. Project entails building a 3,000-ton initial capacity plant (scalable to 4,500 tons) to alleviate strain on the two existing central utility plants (cups), which provide 8,600 tons combined amid system-wide peaks of 11,000 tons. It restores redundancy, mitigates risks from outdated satellite chillers, and integrates via extended chilled water loops. The steel-frame facility, clad in unt brick facade, includes a 2.7 mw electrical load (to 4 mw) and 20" supply/return lines, utilizing allocated west-side space for construction and future expansion.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
DESIGN-BUILD services. Project entails building a 3,000-ton initial capacity plant (scalable to 4,500 tons) to alleviate strain on the two existing central utility plants (cups), which provide 8,600 tons combined amid system-wide peaks of 11,000 tons. It restores redundancy, mitigates risks from outdated satellite chillers, and integrates via extended chilled water loops. The steel-frame facility, clad in unt brick facade, includes a 2.7 mw electrical load (to 4 mw) and 20" supply/return lines, utilizing allocated west-side space for construction and future expansion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →