Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Seeking the services of a qualified contractor with experience in floodplain restoration and/or related experience to carry out the Scope of Work outlined in this bid. This project will restore riparian habitat and floodplain access at the Dorothy Smith Access Area by reducing impervious surface along the parking lot, removing gravel built up on the floodplain, re-vegetating the floodplain, and maintaining river access via a walking path. This project will provide floodplain access, enhance flood resiliency, and reduce sedimentation and stormwater runoff into the Lamoille River. The Access Area is located upstream of the confluence with the Brewster River. This site has historically experienced streambank erosion, sedimentation, and nutrient loading, especially near the Fishing Access Area. This site was identified as a priority in the 2021 Cambridge Stormwater Master Plan and recognized as an erosion hot spot. Floodplain restoration on this Vermont Fish and Wildlife parcel will provide storage for flood water, ice, and debris. Located immediately upstream of the Route 108 bridge, this parcel provides a crucial location for ice, debris, and sediment to settle out, to reduce sedimentation inputs into the Lamoille and Brewster River.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
A. Access development and management of pedestrian traffic within the site; b. Clearing and demolition; c. Erosion, sedimentation and pollution control, and flow management; d. Earthwork including excavating, stockpiling, sorting, grading 1) dead-ending of road and removal of road fill and existing culvert; 2) restoring historic wetlands modified when the site was used as a golf course and enhancing the health and functionality of existing wetlands; 3) removing other structures and stream armoring remaining from the parcel’s use as a golf course, including sorting and stockpiling of armoring material for reuse elsewhere in the work; 4) riffle construction; e. Habitat enhancement activities 1) vernal pool creation 2) turtle nesting habitat creation 3) large-wood addition via chop-and-drop methods 4) seeding and planting f. Construction of pedestrian boardwalk connection at old road; and, g. Construction of new formal parking area and emergency turnaround along old road.
Posted Date
-
Due Date
Jan 23, 2026
Close: Jan 23, 2026
A. Access development and management of pedestrian traffic within the site; b. Clearing and demolition; c. Erosion, sedimentation and pollution control, and flow management; d. Earthwork including excavating, stockpiling, sorting, grading 1) dead-ending of road and removal of road fill and existing culvert; 2) restoring historic wetlands modified when the site was used as a golf course and enhancing the health and functionality of existing wetlands; 3) removing other structures and stream armoring remaining from the parcel’s use as a golf course, including sorting and stockpiling of armoring material for reuse elsewhere in the work; 4) riffle construction; e. Habitat enhancement activities 1) vernal pool creation 2) turtle nesting habitat creation 3) large-wood addition via chop-and-drop methods 4) seeding and planting f. Construction of pedestrian boardwalk connection at old road; and, g. Construction of new formal parking area and emergency turnaround along old road.
AvailableProvide wide area network (wan) and/or internet access.
Posted Date
Dec 19, 2025
Due Date
Feb 6, 2026
Release: Dec 19, 2025
Close: Feb 6, 2026
Provide wide area network (wan) and/or internet access.
AvailableProvide naval support area (NSA) cutler shoreline restoration, coastal resiliency, and asset protection.
Posted Date
Dec 4, 2025
Due Date
Jan 16, 2026
Release: Dec 4, 2025
Close: Jan 16, 2026
Provide naval support area (NSA) cutler shoreline restoration, coastal resiliency, and asset protection.
Work consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument.
Posted Date
Nov 19, 2025
Due Date
Jan 22, 2026
Release: Nov 19, 2025
Close: Jan 22, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of the removal and replacement of the seawall cap, cleaning and restoration of the Perry Monument Plaza and stabilization, cleaning, and restoration of the monument. The existing seawall cap will be removed and replaced. The restoration of the plaza includes removal and replacement of deteriorate concrete sidewalk, concrete crack repair, the removal of the knee wall and moat surrounding the monument, installation of concrete bollards with chains connecting the bollards, and lighting upgrades. The stabilization and restoration of the monument includes polymer soil injections, spall repair, removal and replacement of stone, partial stone replacement, repoint mortar joints, replace brick behind stone, and apply waterproofing and anti-graffiti coating to monument.
Available