Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work involves the offloading and installation of a new lift station at the university well site.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Project consists of the WWTP and lift station improvement project. See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 27, 2026
Release: Jan 8, 2026
Close: Jan 27, 2026
Project consists of the WWTP and lift station improvement project. See outside link.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lift station construction. This construction solicitation will require the full removal and replacement of the lift station. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. See attached file.
Posted Date
Jan 21, 2026
Due Date
Mar 2, 2026
Release: Jan 21, 2026
Close: Mar 2, 2026
Lift station construction. This construction solicitation will require the full removal and replacement of the lift station. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. See attached file.
AvailableThe City of Moscow invites sealed bids for the Palouse Mall Lift Station Rehabilitation Project. Work includes replacing the wet well cover and hatch, installing submersible pumps, new electrical and control systems, upgrading the force main, fence upgrades, and adding a new valve vault and flow meter vault. Bid documents are available through QuestCDN (Project #10020344) with a pre‑bid meeting scheduled for February 12, 2026.
Posted Date
Jan 24, 2026
Due Date
Feb 17, 2026
Release: Jan 24, 2026
Close: Feb 17, 2026
The City of Moscow invites sealed bids for the Palouse Mall Lift Station Rehabilitation Project. Work includes replacing the wet well cover and hatch, installing submersible pumps, new electrical and control systems, upgrading the force main, fence upgrades, and adding a new valve vault and flow meter vault. Bid documents are available through QuestCDN (Project #10020344) with a pre‑bid meeting scheduled for February 12, 2026.
AvailableThe Project includes the furnishing of all labor and materials for the construction complete-in-place of a new sanitary sewer lift station that includes a precast valve vault, precast wet well, submersible pumps, valves, piping, controls, and site work. Site work includes mass grading, bituminous and concrete paving, erosion control, restoration, traffic control, and appurtenant work.
Posted Date
Jan 22, 2026
Due Date
Feb 12, 2026
Release: Jan 22, 2026
Close: Feb 12, 2026
The Project includes the furnishing of all labor and materials for the construction complete-in-place of a new sanitary sewer lift station that includes a precast valve vault, precast wet well, submersible pumps, valves, piping, controls, and site work. Site work includes mass grading, bituminous and concrete paving, erosion control, restoration, traffic control, and appurtenant work.