Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lift station construction. This construction solicitation will require the full removal and replacement of the lift station. The existing lift station provides wastewater service to the hospital quarters units, and several tribal program buildings. Once installation is complete the new lift station will take the full sanitary load for the area currently being serviced by the existing lift station and be sized to handle expansion in the future. Then the existing lift station consisting of the wet well, dry well, pumps and piping will be demolished. The new lift station will consist of a wet well, a dry well, installation of chopper pumps, and force main connection. This project will also include a new control system to allow the facility to monitor flow into the lift station and the status of the equipment. See attached file.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The Indian Health Service (IHS) issued a presolicitation for full removal and replacement of the Rosebud lift station, including demolition of the existing wet well/dry well/pumps and installation of a new wet well, dry well, chopper pumps, force main connection, and a new control system. The project (NAICS 237110) is a firm-fixed-price construction procurement estimated between $500,000 and $1,000,000 with a 120-calendar-day period of performance and is set aside as an Indian Small Business Economic Enterprise (DOI-only) (ISBEE). Bids are currently open (not a grant) with proposals due March 2, 2026; primary contacts listed are Daniel Cotto and Andrew E. Hart from IHS.
Posted Date
Jan 21, 2026
Due Date
Mar 2, 2026
Release: Jan 21, 2026
Close: Mar 2, 2026
The Indian Health Service (IHS) issued a presolicitation for full removal and replacement of the Rosebud lift station, including demolition of the existing wet well/dry well/pumps and installation of a new wet well, dry well, chopper pumps, force main connection, and a new control system. The project (NAICS 237110) is a firm-fixed-price construction procurement estimated between $500,000 and $1,000,000 with a 120-calendar-day period of performance and is set aside as an Indian Small Business Economic Enterprise (DOI-only) (ISBEE). Bids are currently open (not a grant) with proposals due March 2, 2026; primary contacts listed are Daniel Cotto and Andrew E. Hart from IHS.
AvailableThe City of Salinas is soliciting qualified contractors to replace the Lake Street Lift Station, with anticipated completion by fall 2028. The scope includes design and construction of a new triplex lift station, new wet well, force main(s), SCADA implementation, and abandonment of existing facilities. This Request for Qualifications (RFQual) for design/construction services has an estimated project value of approximately $15M-$20M.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
The City of Salinas is soliciting qualified contractors to replace the Lake Street Lift Station, with anticipated completion by fall 2028. The scope includes design and construction of a new triplex lift station, new wet well, force main(s), SCADA implementation, and abandonment of existing facilities. This Request for Qualifications (RFQual) for design/construction services has an estimated project value of approximately $15M-$20M.
Provide lift station pump repairs.
Posted Date
Jan 8, 2026
Due Date
Jan 29, 2026
Release: Jan 8, 2026
Close: Jan 29, 2026
Provide lift station pump repairs.
AvailableThe City of Salinas is soliciting qualifications for a design-build team to replace the Lake Street Lift Station, including a new triplex lift station, wet well, force main, and a SCADA platform. The project scope covers 100% design through construction and commissioning with an estimated budget of $15–$20 million and an expected completion by fall 2028. A mandatory remote pre-bid meeting is scheduled for 2026-01-21; questions are due 2026-01-14 and proposals are due 2026-02-13.
Posted Date
Jan 13, 2026
Due Date
Feb 13, 2026
Release: Jan 13, 2026
Close: Feb 13, 2026
The City of Salinas is soliciting qualifications for a design-build team to replace the Lake Street Lift Station, including a new triplex lift station, wet well, force main, and a SCADA platform. The project scope covers 100% design through construction and commissioning with an estimated budget of $15–$20 million and an expected completion by fall 2028. A mandatory remote pre-bid meeting is scheduled for 2026-01-21; questions are due 2026-01-14 and proposals are due 2026-02-13.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis