Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of university k-12 remodeling & addition.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Project consists of school addition and remodeling concrete package. Work include bc-03b interior flatwork and exterior stair and ramp.
Posted Date
Jan 26, 2026
Due Date
Feb 23, 2026
Release: Jan 26, 2026
Close: Feb 23, 2026
Project consists of school addition and remodeling concrete package. Work include bc-03b interior flatwork and exterior stair and ramp.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes additional 1000 SF contains a split-level metal pan stair, a 3500 lb. TKE Elevator, the RTU, CMU gearing walls, clad in aluminum Longboard siding. EPDM Roof. 500 SF reception area remodeling on Upper Level. 5,000 SF Lower Level interior remodeling with typical interior finishes. o Total square footage of the project is approx. 10,570 S.F. Lower Level +/- 5,200 SF community Room First Floor +/- 500 S.F. reception area.
Posted Date
Dec 25, 2025
Due Date
Feb 11, 2026
Release: Dec 25, 2025
Close: Feb 11, 2026
Work includes additional 1000 SF contains a split-level metal pan stair, a 3500 lb. TKE Elevator, the RTU, CMU gearing walls, clad in aluminum Longboard siding. EPDM Roof. 500 SF reception area remodeling on Upper Level. 5,000 SF Lower Level interior remodeling with typical interior finishes. o Total square footage of the project is approx. 10,570 S.F. Lower Level +/- 5,200 SF community Room First Floor +/- 500 S.F. reception area.
AvailableWork includes construction of a new 4,492 SF addition. The addition contains (4) pre-k classrooms containing two (2) shared restrooms. The addition also includes a connecting corridor / lobby between the new pre-k classrooms and the existing gymnasium building. The gym renovation encompasses 8,295 SF of existing building.
Posted Date
Jan 28, 2026
Due Date
Feb 18, 2026
Release: Jan 28, 2026
Close: Feb 18, 2026
Work includes construction of a new 4,492 SF addition. The addition contains (4) pre-k classrooms containing two (2) shared restrooms. The addition also includes a connecting corridor / lobby between the new pre-k classrooms and the existing gymnasium building. The gym renovation encompasses 8,295 SF of existing building.
AvailableK-12 HR Management System.
Posted Date
Jan 30, 2026
Due Date
Feb 12, 2026
Release: Jan 30, 2026
Close: Feb 12, 2026
K-12 HR Management System.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →