Closing soon

Unit Price Contract for Maintenance Dredging of Pensacola Harbor Entrance Channel RFP

Description: The requirement will be for hydraulic cutterhead pipeline dredges, trailing suction hopper dredges, and/or mechanical dredges with scows. Dredges must be capable of dredging to a depth of 39 feet and be complete with crew, management staff and support equipment including tugs and various other floating plants as would normally be expected to support a large dredging operation. The material type expected for this requirement will be maintenance material typical for Pensacola Entrance Channel composed of sand. Material dredged will be placed west of the Pensacola Entrance Channel along Perdido Key Beach. The maximum pumping distance for beach placement will be approximately 30,000-feet.

Buyer
Released
Aug 14, 2026
Closes
Aug 31, 2026(14 days left)

Files

Original attachments and procurement documents tied to this bid.

Federal RFP files are for Starbridge customers only.

You can request RFP files from all other buyer types for free on this site.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts