Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Phoenix requests statements of qualifications for engineering services to design and support construction of the Union Hills Water Treatment Plant finished water improvements, including a new 20 million gallon reservoir and rehabilitation of an existing 40 MG reservoir. The selected consultant team will provide design, possible construction administration and inspection, and must use the City’s UNIFIER project management system. The solicitation is a Request for Qualifications (SOQ) with document and submission details available on the City of Phoenix procurement portal.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Provide preconstruction services and complete construction services: provide detailed cost estimating and knowledge of marketplace conditions; provide project planning and scheduling; provide for construction phasing and scheduling that will minimize interruption to city operations; advise city on ways to gain efficiencies in project delivery; participate with the city in a process to set a goal for local and sbe participation and implement the local and sbe process; protect the owner's sensitivity to quality, safety, and environmental factors; provide alternate systems evaluation and constructability studies. See outside link.
Posted Date
Jan 8, 2026
Due Date
Jan 30, 2026
Release: Jan 8, 2026
Close: Jan 30, 2026
Provide preconstruction services and complete construction services: provide detailed cost estimating and knowledge of marketplace conditions; provide project planning and scheduling; provide for construction phasing and scheduling that will minimize interruption to city operations; advise city on ways to gain efficiencies in project delivery; participate with the city in a process to set a goal for local and sbe participation and implement the local and sbe process; protect the owner's sensitivity to quality, safety, and environmental factors; provide alternate systems evaluation and constructability studies. See outside link.
AvailableClose: Jan 22, 2026
Water treatment plant improvements.
Provide water treatment plant #2 improvements.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
Provide water treatment plant #2 improvements.
Available1A. Construction of a New water treatment plant, including two (2) 0.5 MGD membrane ultrafiltration skids, one clean-inplace sid, Chemical storage and metering system, two (2) finished water pumps and associated piping, valving, controls integration and start up. Construction of improvements to the existing taw water intake maintenance building, including two (2) raw water pumps, associated piping, valving, controls integration and start up. 1B. Construction of all electrical improvements. 1C. Construction of HVAC systems. 1D. Construction of all plumbing improvements.
Posted Date
Dec 16, 2025
Due Date
Feb 4, 2026
Release: Dec 16, 2025
Close: Feb 4, 2026
1A. Construction of a New water treatment plant, including two (2) 0.5 MGD membrane ultrafiltration skids, one clean-inplace sid, Chemical storage and metering system, two (2) finished water pumps and associated piping, valving, controls integration and start up. Construction of improvements to the existing taw water intake maintenance building, including two (2) raw water pumps, associated piping, valving, controls integration and start up. 1B. Construction of all electrical improvements. 1C. Construction of HVAC systems. 1D. Construction of all plumbing improvements.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis