Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes demolition of the existing concessions building, footings, and utility vault north of the existing building. Existing utilities serving the concessions building and irrigation will be re-routed to serve the new building. A fire hydrant will be relocated. Construction of a new 2200 SF building to house restrooms, a storage room, and concessions. The building is a wood post-framed structure with metal panel exterior walls. Additional area is covered by a roof overhang on the north and west sides of the building. The building will not be heated or cooled, but exhaust fans will be provided in the restrooms and concessions spaces. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Construction services for the Underwood Creek Daylighting project, including demolition, new channel excavation, concrete retaining wall construction, culvert and pedestrian bridge installation, storm sewer work, asphalt paving, concrete curb and sidewalk construction, landscaping, and vegetation maintenance.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Construction services for the Underwood Creek Daylighting project, including demolition, new channel excavation, concrete retaining wall construction, culvert and pedestrian bridge installation, storm sewer work, asphalt paving, concrete curb and sidewalk construction, landscaping, and vegetation maintenance.
AvailableProject consists of the new concessions, restrooms, and storage facility for the County soccer field. Scope includes minor earthwork, site concrete, site utilities, concrete foundations, load-bearing masonry, roofing, doors and frames, canopies, countertops, painting (alternate), etc. All the interior mechanical/electrical/plumbing scope of work is Owner Furnished and Owner Installed.
Posted Date
Dec 19, 2025
Due Date
Jan 15, 2026
Release: Dec 19, 2025
Close: Jan 15, 2026
Project consists of the new concessions, restrooms, and storage facility for the County soccer field. Scope includes minor earthwork, site concrete, site utilities, concrete foundations, load-bearing masonry, roofing, doors and frames, canopies, countertops, painting (alternate), etc. All the interior mechanical/electrical/plumbing scope of work is Owner Furnished and Owner Installed.
Demolition and abandonment of the existing underwood creek channel culvert and stream channel. New channel excavation and construction. Soil disposal. Concrete retaining wall construction. Quarry stone bank armoring. New road crossing culvert construction at wall street. Pedestrian bridge across the newly constructed channel. Storm sewer construction. Asphalt road and parking lot paving. Concrete curb and gutter and sidewalk construction. Landscaping and restoration of areas disturbed during construction. Maintenance of vegetation and plant items.
Posted Date
Jan 6, 2026
Due Date
Jan 27, 2026
Release: Jan 6, 2026
Close: Jan 27, 2026
Demolition and abandonment of the existing underwood creek channel culvert and stream channel. New channel excavation and construction. Soil disposal. Concrete retaining wall construction. Quarry stone bank armoring. New road crossing culvert construction at wall street. Pedestrian bridge across the newly constructed channel. Storm sewer construction. Asphalt road and parking lot paving. Concrete curb and gutter and sidewalk construction. Landscaping and restoration of areas disturbed during construction. Maintenance of vegetation and plant items.
Operation of a food and beverage concessions.
Posted Date
Dec 24, 2025
Due Date
Feb 5, 2026
Release: Dec 24, 2025
Close: Feb 5, 2026
Operation of a food and beverage concessions.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis