Posted
Aug 29, 2026
Sep 14, 2026
UMSB Cages Installation
A requirement to add to the existing first-level storage cage system located within the warehouse mezzanine of bldg. 3245.
Description: The U.S. Army Corps of Engineers Headquarters, through the Humphreys Engineer Center Support Activity, issued this active combined synopsis/solicitation as a total small-business set-aside under NAICS 561210 for renovation of the A-Wing interior at the Casey Building in Alexandria, Virginia. The work covers selective demolition, new interior partitions, window infills, doors, finishes, and installation or restoration of RF shielding and conductive foil, with a required site visit on September 2. Quotes are due September 8, 2026, at 6:00 p.m. EDT, and offerors must meet the stated U.S. citizenship or nationality and facility-access requirements.
Federal · VA, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
These related opportunities are still open for bidding.
Posted
Aug 29, 2026
Sep 14, 2026
A requirement to add to the existing first-level storage cage system located within the warehouse mezzanine of bldg. 3245.
CityTX
Posted
Sep 20, 2022
Oct 11, 2027
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
Special DistrictAL
Posted
May 26, 2026
Sep 15, 2026
Requirement for remodeling of 10 bathrooms, replacement of 4 water fountains, the replacing of all the carpet and the installation of a raised floor in two communications closets.
Posted
Aug 13, 2026
Sep 18, 2026
The New York State Office for People with Developmental Disabilities is soliciting a contractor to gut and renovate the kitchen at 1150 Forest Hill Road, Building 47, Staten Island. The work is a construction procurement listed as a discretionary procurement under $50,000 and includes a mandatory scheduled site visit. Bidders must submit a cost breakdown for materials, labor, and overhead where applicable, with responses due September 18, 2026.