Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovation of holmes hall rooms 448, 449A/B, 449, 453A, 458, and limited exterior work. Work shall include, but is not limited to, new vinyl composition tile, resilient base, painting, rerouting of AC and lighting, plumbing, air conditioning, insulation of mechanical systems, electrical, fire alarm, hazardous material abatement, structural steel, metal doors and frames, finish hardware, laboratory fume hoods and casework.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Selective demolition, hazardous materials abatement, carpentry, interior plaster, sealants, window coverings, gypsum board, acoustical ceiling system, painting, flooring, electrical, air conditioning and insulation and miscellaneous related work. Prior to start of construction, the general contractor shall inventory, tag, label all existing furniture and furnishings.
Posted Date
Dec 23, 2025
Due Date
Jan 30, 2026
Release: Dec 23, 2025
Close: Jan 30, 2026
Selective demolition, hazardous materials abatement, carpentry, interior plaster, sealants, window coverings, gypsum board, acoustical ceiling system, painting, flooring, electrical, air conditioning and insulation and miscellaneous related work. Prior to start of construction, the general contractor shall inventory, tag, label all existing furniture and furnishings.
AvailableIndiana University of Pennsylvania, on behalf of the PA State System of Higher Education, invites bids for renovations to McElhaney Hall. The project includes building one large classroom, additional classroom space, and renovating multiple offices across the first and second floors, plus associated mechanical work including shafts, duct connections, and a new rooftop unit. Bidding is conducted electronically via PennBid, with a non-mandatory pre‑bid meeting and questions handled through the portal.
Posted Date
Dec 23, 2025
Due Date
Jan 27, 2026
Release: Dec 23, 2025
Close: Jan 27, 2026
Indiana University of Pennsylvania, on behalf of the PA State System of Higher Education, invites bids for renovations to McElhaney Hall. The project includes building one large classroom, additional classroom space, and renovating multiple offices across the first and second floors, plus associated mechanical work including shafts, duct connections, and a new rooftop unit. Bidding is conducted electronically via PennBid, with a non-mandatory pre‑bid meeting and questions handled through the portal.
Work includes classroom office building first floor renovation.
Posted Date
Dec 1, 2025
Due Date
Jan 15, 2026
Release: Dec 1, 2025
Close: Jan 15, 2026
Work includes classroom office building first floor renovation.
AvailablePhase 1 consists of selective building demolition including hazardous material removal, wall and ceiling assemblies, finishes, plumbing, mechanical, electrical, and fire alarm systems. The building shall remain unoccupied until phase 2 (Renovation) beneficial occupancy or final completion.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Phase 1 consists of selective building demolition including hazardous material removal, wall and ceiling assemblies, finishes, plumbing, mechanical, electrical, and fire alarm systems. The building shall remain unoccupied until phase 2 (Renovation) beneficial occupancy or final completion.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis