Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Lakeland (Lakeland Electric) seeks an experienced contractor to provide a comprehensive water treatment program for the Unit 5 cooling tower and associated systems at the McIntosh Power Plant, using reuse water. The scope includes implementing the plant’s established chemical treatment program, comprehensive testing and quality control, real-time online monitoring, and supplying/maintaining chemical feed systems to ensure proper operation and condenser cleanliness. The initial contract term is two years with options for three additional one-year renewals upon mutual consent.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The City of Lakeland Department of Electric seeks a qualified water treatment service company to implement a comprehensive chemical treatment and real-time monitoring program for the Unit 5 cooling tower and associated condenser systems at the McIntosh Power Plant. The contract term is two years (starting February 2026 and ending September 30, 2027) with options for three additional one-year renewals upon mutual consent. Required services include supplying and maintaining chemical feed systems, immediate response to system failures, regular water testing, corrosion control to specified rates, and electronic tracking/online monitoring viewable by plant operators.
Posted Date
Dec 31, 2025
Due Date
Jan 29, 2026
Release: Dec 31, 2025
Close: Jan 29, 2026
The City of Lakeland Department of Electric seeks a qualified water treatment service company to implement a comprehensive chemical treatment and real-time monitoring program for the Unit 5 cooling tower and associated condenser systems at the McIntosh Power Plant. The contract term is two years (starting February 2026 and ending September 30, 2027) with options for three additional one-year renewals upon mutual consent. Required services include supplying and maintaining chemical feed systems, immediate response to system failures, regular water testing, corrosion control to specified rates, and electronic tracking/online monitoring viewable by plant operators.
AvailableCooling tower water treatment.
Posted Date
Dec 29, 2025
Due Date
Jan 21, 2026
Release: Dec 29, 2025
Close: Jan 21, 2026
Cooling tower water treatment.
AvailableReplacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU).
Posted Date
Dec 2, 2025
Due Date
Jan 30, 2026
Release: Dec 2, 2025
Close: Jan 30, 2026
Replacement of the cooling tower at the Law Enforcement Center and the installation of a new chilled water cooling coil in the air handling unit (AHU).
AvailableProvide construction of the central plant cooling tower replacement. Scope of the work is to address the necessary repairs and upgrades at the central plant: demolition and removal of existing components: old cooling tower. Two cooling tower water pumps. Associated piping, supports, controls, and electrical equipment. Related structural pads and pedestals. Water filtration system. Other items per plans and specifications. The installation of the following components. New two-cell cooling tower to connect in parallel with the existing cooling tower. Two new cooling tower water pumps. New control panels for equipment and vfds with side mounted air conditioning units. Upgrades of mechanical piping, electrical, and control systems. New cover/canopy to protect miscellaneous electrical and control panels from weather elements and rain.
Posted Date
Dec 18, 2025
Due Date
Jan 22, 2026
Release: Dec 18, 2025
Close: Jan 22, 2026
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide construction of the central plant cooling tower replacement. Scope of the work is to address the necessary repairs and upgrades at the central plant: demolition and removal of existing components: old cooling tower. Two cooling tower water pumps. Associated piping, supports, controls, and electrical equipment. Related structural pads and pedestals. Water filtration system. Other items per plans and specifications. The installation of the following components. New two-cell cooling tower to connect in parallel with the existing cooling tower. Two new cooling tower water pumps. New control panels for equipment and vfds with side mounted air conditioning units. Upgrades of mechanical piping, electrical, and control systems. New cover/canopy to protect miscellaneous electrical and control panels from weather elements and rain.
Available