Kansas Department of Transportation
Special DistrictKS
Posted
-
Nov 18, 2026
K232-053 KA 6816-01 ACBRF-A681(601)
GRADING, BRIDGE AND SURFACING. K-232: BR 034 OVER HELL CREEK (WILSON LAKE) LOC 2.28 MI N OF EW/LC COLN. LGTH IS 0.720 MI.
Description: PROJECT DESCRIPTION GRADING, BRIDGE AND SURFACING. US-50: BR 003 OVER SUGAR CREEK LOC 11.87 MI E OF OLD US-50 IN RN CO. LGTH IS 0.116 MI.
StateAgency · KS, US
Adjacent opportunities open for bidding right now.
Kansas Department of Transportation
Special DistrictKS
Posted
-
Nov 18, 2026
GRADING, BRIDGE AND SURFACING. K-232: BR 034 OVER HELL CREEK (WILSON LAKE) LOC 2.28 MI N OF EW/LC COLN. LGTH IS 0.720 MI.
CountyKS
Posted
-
Nov 18, 2026
1. The Secretary of Transportation of the State of Kansas [Secretary] will accept only electronic internet proposals from prequalified contractors for construction, improvement, reconstruction, or maintenance work in the State of Kansas, said work known as Project No.: K009-069 KA 6818-01 / ACBRF-A681(801) The general scope, location and net length are: GRADING, BRIDGE AND SURFACING. K-9: BR 051 OVER N FORK SOLOMON DRG LOC 1.44 MI E OF K-173/K-9 JCT IN NT CO. LGTH IS 0.152 MI.
Kansas Department of Transportation
State AgencyKS
Posted
Oct 21, 2026
Nov 18, 2026
Work includes approx 12,904 CY common excavation; 350 LF MGS steel plate guardrail; 45 LF slope drain; 507 SY bridge deck grooving; 19,830 LF 6" (white) (multi-component) pavement marking.
CountyKS
Posted
-
Nov 18, 2026
PROJECT DESCRIPTION GRADING, BRIDGE AND SURFACING. US-160: BEG 0.16 MI W OF US-160/US-183/K-1 JCT N TO E 4TH ST IN CM CO. LGTH IS 5.20 MI. STATE TIED TO KA 6876-01. The general scope, location and net length are: GRADING, BRIDGE AND SURFACING. US-160: BEG 0.16 MI W OF US-160/US-183/K-1 JCT N TO E 4TH ST IN CM CO. LGTH IS 5.20 MI. STATE TIED TO KA 6876-01. RESTRICTED DAYS (295) TOTAL CONTRACT DAYS (335) TIED TO: 526116515 KA 6876-01 Earliest Start Date: MARCH 01, 2027 Latest Start Date: JUNE 07, 2027 Additional project information included in the Proposal/Contract Documents: required contract provisions and special provisions as listed in the Special Provision List (including wage determinations, price adjustment provisions, tax clearance requirement, environmental and traffic control provisions, and multiple material and construction specifications). The funding source for this Project is STATE.
Decision makers connected to this RFP from Kansas Department of Transportation.
Solicitation files and supporting documents for this bid.