CityTX
Aug 13, 2026
Closes
Aug 31, 2026
TXDOT Hwy 277 Utility Relocation
Provide replacement of existing 6" PVC water line with a new 10" HDPE water line and 16" steel encased.
Description: Work inlcudes 1,832 LF water and sewer line extension 10" pvc (c-900); 21 EA 10" 45 bend; 2 EA 10" 22.5 bend; 2 EA 10" water valve; 6 EA 10" waterline tie-in; 1,604 LF 6" pvc (c-900); 5 EA 6" 45 bend; 2 EA 6" 22. 5 bend; 2 EA 6" force main tie-in; 20 sy asphalt pavement repair; 1 EA fire hydrant assembly.
City · TX, US
Original attachments and procurement documents tied to this bid.
Procurement and program contacts connected to City of Gregory.
Adjacent opportunities open for bidding right now.
CityTX
Aug 13, 2026
Closes
Aug 31, 2026
Provide replacement of existing 6" PVC water line with a new 10" HDPE water line and 16" steel encased.
Guadalupe-Blanco River Authority
Special DistrictTX
-
Closes
Sep 15, 2026
The Guadalupe-Blanco River Authority is requesting proposals for construction of the FM 237 TXDOT Coleto Creek Pipeline Relocation project. The work includes approximately 111 linear feet of open-cut, 48-inch flanged split steel casing welded to the existing carbon steel encasement, approximately 59 linear feet of concrete trench cap, erosion controls, site restoration, and seeding. The estimated project cost is $405,000, with a mandatory meeting scheduled for August 31, 2026, and bids due September 15, 2026, at 12:00 PM; this is a construction solicitation, not a grant program.
FederalSD
Aug 5, 2026
Closes
Sep 4, 2026
This active federal contract opportunity is a Justification for electric utility service for the Pine Ridge Agency, rather than a grant program. The Bureau of Indian Affairs, Great Plains Region, identifies the requirement under the authority of Only One Source, with NAICS 221122 and Product Service Code S112. No response deadline is listed; the notice is scheduled to become inactive 30 days after publication, on September 4, 2026.
Northwestern Water And Sewer District
Special DistrictOH
Aug 12, 2026
Closes
Sep 3, 2026
Work includes approx 1,671 LF 3" PVC DR18 sanitary force main by directional bore; 190 LF 3" PVC DR18 sanitary force main by open cut; 2,600 SY seeding and mulching; 1 LS erosion control; 1 EA 12" water line connect to existing pipe.