Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Purchase and delivery of two well pump motors.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
(7) well pumps and (6) booster pumps maintenance and inspection: 1. Flow test each well for a maximum of one hour using flow meter of calibrated orifice 2. Flow test each booster pump for a maximum of one-half hour directly into the system 3. Record static and pumping water levels in the well during the test. 4. Record appropriate discharge pressures during the test. 5. Calculate the specific capacity of the well. 6. Plot performance to determine current operating conditions versus design conditions or previous maintenance inspections. 7. Record amperage and meggar test electric motors where applicable. 8. Record vibration magnitudes on the motor while running. 9. Change oil and re-grease motors as required. 10. Inspect packing and add if necessary 11. Inspect all other applicable equipment within the well house to determine if any addition repairs are needed. 12. Provide a written report containing all the test data and results. Reviewed by a professional engineer. 13. Provide a complete list of recommended repairs.
Posted Date
Nov 26, 2025
Due Date
Dec 11, 2025
Release: Nov 26, 2025
Premium
Access the largest public sector contact database
Close: Dec 11, 2025
(7) well pumps and (6) booster pumps maintenance and inspection: 1. Flow test each well for a maximum of one hour using flow meter of calibrated orifice 2. Flow test each booster pump for a maximum of one-half hour directly into the system 3. Record static and pumping water levels in the well during the test. 4. Record appropriate discharge pressures during the test. 5. Calculate the specific capacity of the well. 6. Plot performance to determine current operating conditions versus design conditions or previous maintenance inspections. 7. Record amperage and meggar test electric motors where applicable. 8. Record vibration magnitudes on the motor while running. 9. Change oil and re-grease motors as required. 10. Inspect packing and add if necessary 11. Inspect all other applicable equipment within the well house to determine if any addition repairs are needed. 12. Provide a written report containing all the test data and results. Reviewed by a professional engineer. 13. Provide a complete list of recommended repairs.
Lake Houston Pump Station Pumps, Motors and Variable Frequency Drives.
Posted Date
Nov 12, 2025
Due Date
Jan 8, 2026
Release: Nov 12, 2025
Close: Jan 8, 2026
Lake Houston Pump Station Pumps, Motors and Variable Frequency Drives.
AvailablePump and water well repair and maintenance.
Posted Date
Nov 21, 2025
Due Date
Dec 23, 2025
Release: Nov 21, 2025
Close: Dec 23, 2025
Pump and water well repair and maintenance.
AvailableWet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Close: Jan 26, 2026
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.