City of Fruitland
Work consists of improvements to 1,950 LF along stormwater conveyance channel consisting of clearing existing brush and trees, reconstructing and widening the channel cross section, installing fiber logs, rock vanes and plantings. Work also includes replacing 400 LF of existing 30-inch and 40-inch culvert pipe with 8 feet x 4 feet concrete box culvert and replacing 70 LF of existing 48-inch culvert pipe with 8 feet x 4 feet concrete box culvert. Work will include installation of concrete junction boxes and inlets, concrete retaining walls, pavement and site restoration, concrete curb, bypass pumping, 350-feet low pressure force main and traffic control.
Tuxent Branch Stormwater Drainage & Culvert Upgrade- Phase 1
Release
Aug 21, 2024
Close
Sep 25, 2024