Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Furnishing of turbidimeters & controllers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construct the demolition of the municipal water treatment plant.
Posted Date
Dec 25, 2025
Due Date
Jan 29, 2026
Release: Dec 25, 2025
Close: Jan 29, 2026
Construct the demolition of the municipal water treatment plant.
AvailableThe Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
Posted Date
Jan 23, 2026
Due Date
Apr 22, 2026
Release: Jan 23, 2026
Close: Apr 22, 2026
The Town of Orange issued a PPEA solicitation for the rehabilitation of its Water Treatment Plant filter system, including the replacement of granular filter media and repair of underdrains. The project involves structural and process improvements to filtration units to meet Virginia Department of Health standards. The estimated value of the project ranges from $500,000 to $1,500,000 with a response deadline in April 2026.
AvailableWork consists of approx. Remove and replace all filter media; remove the existing pressure filter underdrain plate; grit blast and re-coat the interior of the pressure filter; new pressure filter header/lateral underdrain collection system; new pressure filter concrete floor and airwash distribution grid; airwash - regenerative blower package (filter, check valve, PRV, ISO-valve, gauge); aerator packing - 150 FT3 of 3.5" polypropylene packing media; aerator raw water distribution - (50) interior spray nozzles; loss of head (LOH) gauge panel backwash monitoring system; new sample taps w/ mud legs; float switch replacement; spent media radium (RA) testing and disposal; existing chemical line abandonment; start-up services (incl. commissioning raw water and filtered effluent testing). See outside links for more details.
Posted Date
Dec 19, 2025
Due Date
Jan 29, 2026
Release: Dec 19, 2025
Close: Jan 29, 2026
Work consists of approx. Remove and replace all filter media; remove the existing pressure filter underdrain plate; grit blast and re-coat the interior of the pressure filter; new pressure filter header/lateral underdrain collection system; new pressure filter concrete floor and airwash distribution grid; airwash - regenerative blower package (filter, check valve, PRV, ISO-valve, gauge); aerator packing - 150 FT3 of 3.5" polypropylene packing media; aerator raw water distribution - (50) interior spray nozzles; loss of head (LOH) gauge panel backwash monitoring system; new sample taps w/ mud legs; float switch replacement; spent media radium (RA) testing and disposal; existing chemical line abandonment; start-up services (incl. commissioning raw water and filtered effluent testing). See outside links for more details.
AvailablePerform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
Posted Date
Jan 7, 2026
Due Date
Feb 5, 2026
Release: Jan 7, 2026
Close: Feb 5, 2026
Perform inspection services during the reservoir 1 water treatment plant filter valve replacement project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →