Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work tub surround installation process and procedure: Demo and remove existing wall tile or current surround and caulking; Remove any damaged drywall behind area of new surround; If needed, install studs around wall to attach surround; Install sectional tub surround; Patch, repair, and paint damaged walls around new surround; Re-caulk entire perimeter of tub and as needed.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
Posted Date
Dec 17, 2025
Due Date
Feb 12, 2026
Release: Dec 17, 2025
Close: Feb 12, 2026
Removal of existing tiled bathtub surround including substrates and insulation to bare wood stud framing. Removal of existing shower/ tub valve, divertor, shower head and tub spout. Modification to existing plumbing to install new shower head system, tub spout and mixing valve with integral divertor. Install new insulation, vapor barrier, cement board, and maintenance free one-piece wall-surround assembly including integral double corner- shelf. Existing bathtub to remain.
AvailableRelease: May 24, 2023
Close: Mar 13, 2028
Supply and installation of furniture.
AvailableProcurement and installation of a standby generator.
Posted Date
-
Due Date
Dec 31, 2025
Close: Dec 31, 2025
Procurement and installation of a standby generator.
AvailableFlooring, cabinetry, tub resurfacing.
Posted Date
Dec 21, 2025
Due Date
Jan 23, 2026
Release: Dec 21, 2025
Close: Jan 23, 2026
Flooring, cabinetry, tub resurfacing.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis