Open RFP

Truth or Consequences Critical Waterline Replacements

Description: Project includes the replacement and new installation of waterlines using open trench, jack and bore, and horizontal directional drilling (HDD) methods. Open trench construction consists of approximately 116 LF of 4", 31,508 LF of 6", 2,812 LF of 8", and 888 LF of 10" C-900 DR-18 PVC waterline. All waterline replacements will be installed parallel to the existing waterlines. The project also includes the installation of approximately 70 LF of 8" waterline carrier pipe within a 16" steel casing by jack and bore, and 60 LF of 10" waterline carrier pipe within an 18" steel casing by jack and bore, both under NMDOT roadway crossings. Additionally, approximately 208 LF of 6", 129 LF of 8", and 118 LF of 10" C-900 DR-18 FPVC waterlines will be installed by horizontal directional drilling.

Released
Sep 10, 2026
Closes
Oct 29, 2026(38 days left)

Files

Original attachments and procurement documents tied to this bid.

No files attached to this RFP.

Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.

Request File Retrieval
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts