Summary
Construction of a right turn lane and the replacement of the curb and trench drain west of drive and associated improvements including the addition and/or modification of storm sewers, pavement markings and signage. Work includes, 25360 SY of subgrade compaction with proof rolling; 7546 SF of 4" concrete walk; 3109 SY of seeding and mulching, class 1; 1302 ft of no. 8 awg 600 volt distribution cable; 331 SY of pavement removed; 540 SF of walk removed; 485 CY of excavation; 308 CY of embankment; 948 SF of curb ramp, as per plan; 150 SY of 9" concrete traffic island; 259 CY of topsoil furnished and placed; 457 CY of 6" asphalt concrete base, pg64-22; 111 CY of 1-1/2" asphalt concrete intermediate course, type 2 (449). See outside link.