Work includes right-of-way construction, sub-surface utility installations (water, wastewater, stormwater), earthwork and grading, drainage improvements, and related appurtenances needed to facilitate the development of an additional 67 lots. Additionally, stockpiles of brush, trees, debris, and rock located in an adjacent future phase will need to be demolished and removed from the site.
Provide on-call right of way services for multiple county projects and to establish a pre-qualified shortlist of firms that the County may solicit for future project-specific contracts. Right of Way services may include acquisitions, appraisals, relocation services, title and escrow coordination including clearing title encumbrances, right of way mapping an document review, utility coordination, negotiations for real property rights, eminent domain
coordination, and preparation of Right of Way certifications and sale of excess property.
Improvements includes maintenance and protection of traffic; excavation of test pits for utility upgrades; repair and reconstruction of approx. 25 +/- existing storm sewer inlet structures of various types; removal of existing inlets and construction of new inlets of various types; construction of new inlets of various types; removal / replacement of approx. 9 +/- existing deteriorated Storm sewer manhole casting; reconstruction of existing Storm sewer manhole structures, where ordered; furnishing and installation of storm sewer pipe reaches of various types and sizes, excavation of approx. 15 +/- test pits for Properties requiring water service Investigations / Verifications; installation of approx. 1,200 LF +/- of 8" cement lined DIP Class 52 water main; connections to existing water lines of various sizes; installation of new 8" MJ gate valve; installation of approx. 2 +/- new fire hydrant assemblies; removal / replacement of approx. 2 +/- existing undersized fire hydrants including connections to existing pipe runouts, adjusting to grade and all appurtenances; installation of approx. 12 +/- new 1" water services including new curb stops / curb boxes and connections to proposed / existing water lines and existing water services, where ordered; removal of existing water service curb boxes and installation of new curb boxes supplied by Others, if and where ordered; abandonment of approx. 12 +/- existing water services, where ordered; removal of existing galvanized water services and replacement with new copper water service lines including connections to proposed water service curb boxes and to existing water meters located within the subject dwellings, where ordered; resetting of existing water main / hydrant valve boxes to grade; installation of concrete encasement around existing utility lines, where ordered; removal / replacement of approx. 14 +/- existing deteriorated Standard and Oversized Sanitary sewer manhole castings; reconstruction of existing Sanitary sewer manhole structures, where ordered; removal / replacement of existing 8" gravity sanitary sewer system with approx. 200 LF ± of new 8" PVC SDR-35 pipe reach including maintenance of existing sewage flows, new tee wye branch connections, where ordered; television inspection of removed / replaced sanitary sewer lines and removal / disposal of existing sanitary sewer lines; all connections to existing sewer lines; removal of approx. 2,100 LF +/- of various types of existing concrete curbs; removal of approx. 750 SY +/- of various types of concrete sidewalks, slabs, driveways and/or aprons; construction of approx. 2,000 LFt +/- of new Modified Borough concrete curbs, approx. 100 LFt +/- of new standard County concrete curbs, approx.y 550 SY +/- of new standard Borough concrete sidewalks; approximately 65 square yards +/- of new standard County reinforced concrete sidewalks and approx. 200 SY +/- of new standard Borough reinforced concrete driveways and/or aprons; furnishing / installation of cast-in-place handicapped sidewalk ramp delineation; restoration of hot mix asphalt and stone driveways; cutting / removal of approx.y 1,500 SY +/- of existing asphalt pavement; roadway milling of approx. 13,000 SY +/- of existing asphalt pavement; crack / joint preparation and furnishing / installation of approx. 4,000 LF ± of joint sealer, if and where ordered; the installation of dense graded aggregate base course, if and where ordered; installation of approx. 700 tons +/- of hot mix asphalt base course material; resurfacing the roadway with approx. 2,000 tons +/- of hot mix asphalt surface course material; application of approx. 9,500 LF +/- of pavement stripes / markings (4" wide lines); application of traffic pavement markings (words and symbols), if and where ordered; application of fire hydrant pavement markings (symbols); resetting of approximately 40 +/- of existing regulatory signs on new breakaway type posts; furnishing and installation of topsoil / seed; and all other preparation; right-of-way / property restoration and associated work in accordance with the Contract Documents.
The Alameda County Transportation Commission (Alameda CTC) is seeking statements of qualifications (SOQs) from qualified consultants to provide services for one, multiple, or all of the following categories of services for Alameda CTC:
1. Project Management and Support Services
2. Planning and Project Initiation Services
3. Preliminary Engineering and Final Design Services
4. Utility Support and Coordination Services
5. Right of Way Support Services
6. Construction Management Services
7. Post Construction Monitoring, Reporting, and Project Closeout Services
8. Tolling and Intelligent Transportation Systems (ITS) Services
9. Programs Management and Project Controls
The anticipated performance period is for an initial period of 36 months from April 2027 to March 2030, with options for up to two additional years of service, for a term not to exceed five years. The total anticipated aggregate maximum dollar amount for the approximately three potential on-call master contracts is $75,000,000.00 (seventy-five million) dollars over five (5) years.
Through a one-step Request for Qualifications (RFQ), Alameda CTC anticipates entering into approximately three master contracts for these services. Further, Alameda CTC intends to establish a bench of prequalified firms eligible to compete for future work through targeted Requests for Proposals (RFPs) using the two-step RFQ/RFP process. Each contract issued pursuant to this solicitation may utilize federal funds, in which case federal requirements will apply. Pursuant to current guidance from the State of California acting by and through its Department of Transportation (Caltrans) and Federal Highway Administration (FHWA), the Disadvantaged Business Enterprise (DBE) contract goal for each resulting contract is 0.0%. These contracts are not subject to the Alameda CTC Local Business Contract Equity Program.
Responses should be submitted in accordance with the requirements and instructions set forth in this RFQ. Prospective proposers are responsible for registering, viewing RFQ documents as may be updated, and submitting SOQs via Alameda CTC’s Procurement Portal.
Procurement Portal: https://alamedactc.bonfirehub.com
The Optional Pre-Submittal Meeting will be held at the Alameda CTC offices on Tuesday, November 24, 2026, at 1:00 p.m. Pacific Time (PT); use the below link to register for the Pre-Submittal Meeting.
Pre-Submittal Meeting Registration Link: https://forms.gle/hz14QLmzUsvkUUiK7
SOQ Submittals are due on Thursday, December 17, 2026, before 3:00:00 p.m. PT.
Should you have any questions, please contact Alastair Powell, the Sole Point of Contact for this RFQ, via the Procurement Portal. Thank you for your interest.
Key Contacts on this RFP
Decision makers connected to this RFP from City of North Bay Village.
The adopted FY2025-26 budget reported Treasure Island stormwater pump-station, roadway, drainage, seawall, injection-well and backflow-preventer improvements, with construction planned through 2029.
See 2 sourcesHide sources
Treasure Island Stormwater Improvements Stormwater Pump Stations The Village is undertaking the repair and replacement of stormwater pump stations on Treasure Island. These upgrades aim to enhance the capacity and efficiency of the stormwater system, addressing issues related to flooding and water management. The construction commenced in FY 24-25 and…
Annual financial report
The Village's FY2025 annual report stated that Harbor and Treasure Island sidewalk improvements were in the final stages of design.
See 2 sourcesHide sources
• Harbor and Treasure Island sidewalk improvements are in the final stages of design.
North Bay Village, Florida Annual Comprehensive Financial Report FY2025