CityKS
Posted
Sep 28, 2026
Oct 27, 2026
Traffic Signal Modifications 95th Street & Lowell Avenue / 99th Street & Antioch Road (MT-3120) RFP
Traffic signal modifications.
Description: Work includes approx. of 1,829 SF of sidewalk construction (4"); 1,310 SF of sidewalk ramp construction; 184 SF of detectable warning surface; 71 LF of sidewalk V-curb; 12 SY of milling (2"); 263 LF of curb and gutter, combined (type B) remove and replace; 116 SY of concrete driveway (6"); 225 LF of filter sock (8"); 303 SY of sod (fescue); 493 LF of 6" white (thermoplastic pavement markings); 450 LF of 24" white (preformed thermoplastic pavement markings).
City · KS, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
CityKS
Posted
Sep 28, 2026
Oct 27, 2026
Traffic signal modifications.
CityAZ
Posted
-
Oct 22, 2026
The installation of traffic signals with the appurtenant infrastructure associated with this work, 480 LF of Sawcut Existing Asphalt Pavement; 6,240 SF of Remove Existing Asphalt Pavement; 386 LF of Remove Existing Curb & Gutter; 1,522 SF of Remove Existing Concrete Pavement; 1,980 SF of Remove Existing Concrete Sidewalk; 2 EA of Remove Existing Pole Foundation; 74 LF of Remove Existing Landscape Curb; 1 EA of Remove Existing Streetlight Concrete Cap as Necessary to Construct a New Concrete Cap. See outside link & attached file
CityVA
Posted
Sep 23, 2026
Oct 20, 2026
The City of Waynesboro is soliciting bids to replace the traffic signal at W. Broad Street and Arch Avenue, which serves regular traffic and emergency services. Work includes removing the existing signal equipment and installing a new signal system, along with related concrete demolition, wiring and conduit, junction boxes, signage, and pavement markings. The project is locally funded; bidders must hold a Virginia Class A or B contractor’s license and be prequalified with VDOT, and the work is expected to be completed within 270 calendar days after the notice to proceed.
CityCA
Posted
Sep 17, 2026
Oct 15, 2026
Work includes 53 SF asphalt paving and base removal; 1,600 SF concrete removal; 5 EA sign post and foundation removal; 1 LS pavement marking removal; 2 EA streetlight pull box replacement; 1 EA streetlight pull box reconstruction (in existing concrete); 1,050 SF concrete sidewalk; 3 EA curb ramps (all types); 250 LF type a concrete curb and gutter; 18 LF type concrete vertical curb; 2 SF valley gutter. See outside link.
Decision makers connected to this RFP from City of Overland Park.