Posted
Nov 4, 2026
Dec 1, 2026
Request for Qualifications for Trade Contractors
Prequalification of trade contractors across 15 construction packages for the renovation and stabilization of the Lynn District Courthouse.
Description: Salt shed replacement project.
City · MA, US
From the first pre-RFP signals to the published RFP and its files.
Meeting agenda
616 days before RFP
Weston & Sampson proposed a feasibility study for the DPW salt shed replacement covering facility programming, site access, environmental constraints, and temporary salt storage during construction.
The City seeks to establish a connection between Garden Street and Sherman Street to address the constraints posed by the existing single access driveway, which is shared with public parking. These constraints significantly impact DPW operations, particularly during snow emergencies, by hindering plow truck access, causing queuing issues, and compromising…
City of Cambridge City Council Regular Meeting
Meeting agenda · Mar 6, 2025
Board meeting
339 days before RFP
City staff described a scoped plan to replace the non-repairable Salt Shed with the minimum facility needed for salt and brine operations and to use a construction manager at risk for early estimating and value engineering; the City Council adopted the request to seek Massachusetts Office of the Inspector General authorization for that CM-at-risk procurement and construction method.
We move now to Number 2. This is pulled by Councillor Nolan. It reads as follows. A communication transmitted from Yi-An Huang, City Manager, relative to a request for approval to seek authorization from the Massachusetts Office of the Inspector General, the IG, for the City to use construction management at-risk procurement and construction method in…
Board meeting
198 days before RFP
The Planning Board recorded unanimous votes to conclude the salt-shed hearing and transmit its report to the City Clerk and Board of Zoning Appeal.
5 Okay. I'm not seeing any. All right. So as Jeff 6 mentioned, what we have to do is send a report to the City 7 Clerk. 8 So I think, at this point, the report would 9 basically say that we've had a presentation, and then does 10 the Planning Board want to go on record as in support of the 11 project or just, you know, leave it with no comment? 12 We're not…
Meeting agenda
182 days before RFP
The Board of Zoning Appeal agenda proposed consideration of the City's variance and special-permit applications for the new 79 Sherman Street salt shed.
The Board of Zoning Appeal will hold a Virtual Public Meeting, THURSDAY -- MAY 14, 2026. Members of the public can participate or view the meeting remotely using the Zoom Webinar link: https://cambridgema.zoom.us/j/85299551558 Or join by phone: Dial +1 929 436 2866 or +1 301 715 8592 - Webinar ID: 852 9955 1558 6:00 P.M. CASE NO. BZA-1205579 79 SHERMAN…
Board Of Zoning Appeal Virtual Public Meeting
Meeting agenda · May 14, 2026
RFP published
Proposals due (11 days left)
Cambridge City Council Regular Meeting
Board meeting · Dec 8, 2025
Project History: • 2019 ARUP Evaluation identified significant structural and operational issues • 2022 Schematic Design study for replacement -- did not proceed • 2024 New Feasibility Study for Replacement -- completed • 2025 Move forward to full design & construction 1.2.a Packet Pg. 53 A tt ac h m en t: D P W S al t S h ed P ro je ct S u m m ar y ( C M A…
City of Cambridge City Council Regular Meeting
Meeting agenda · Dec 8, 2025
Budget and Funding Funding Source: • Part of FY24 Municipal Facilities Improvement Plan (MFIP) Appropriation • $35.5m total MFIP Appropriation • $8m of the $35.5m assigned to DPW Projects, including the Salt Shed 1.2.a Packet Pg. 61 A tt ac h m en t: D P W S al t S h ed P ro je ct S u m m ar y ( C M A 2 02 5 #2 83 : C o n st ru ct io n M an ag er a t R is k…
City of Cambridge City Council Regular Meeting
Meeting agenda · Dec 8, 2025
After the City of Cambridge receives notice from the OIG to commence with soliciting CMaR services the selection committee shall meet and define the following: • Prepare and advertise the RFQ for CMaR services following the procedures set forth in M.G.L. c 149A • The Selection Committee receives and evaluates the statement of qualifications and pre-qualify…
City of Cambridge City Council Regular Meeting
Meeting agenda · Dec 8, 2025
2. A communication transmitted from Yi-An Huang, City Manager, relative to a request for approval to seek authorization from the Massachusetts Office of the Inspector General (the "IG") for the City to use the Construction Manager at Risk ("CMaR") procurement and construction method (the "CMaR Method") in connection with the DPW Salt Shed Replacement…
City of Cambridge City Council Regular Meeting
Meeting agenda · Dec 8, 2025
Planning Board of the City of Cambridge General Hearing
Board meeting · Apr 28, 2026
3 Our project is focused in this portion, where 4 we'll be replacing the salt shed, doing some minor, like, 5 reorganization and operational improvements, as well as 6 modifying an existing access road for emergency vehicles to 7 access the park. 8 So we'll be focusing on this part of the project 9 on the site. 10 So this is the Existing Conditions Plan.…
Planning Board of the City of Cambridge General Hearing
Board meeting · Apr 28, 2026
Adjacent opportunities open for bidding right now.
Posted
Nov 4, 2026
Dec 1, 2026
Prequalification of trade contractors across 15 construction packages for the renovation and stabilization of the Lynn District Courthouse.
CityBC
Posted
Oct 29, 2026
Nov 23, 2026
The purpose of this RFP is to request proposals from qualified manufacturers and contractors with demonstrated experience in the supply and installation of a prefabricated, steel-framed, fabric-covered salt storage shed. The installation of the shed is expected to be completed in the Spring of 2027.
CityMA
Posted
Nov 11, 2026
Nov 27, 2026
Elevator (only) trade contractor. Project consists of a ground-up, 90,000+/- GSF municipal complex housing town hall, police, and fire, along with a 4,000+/- GSF outbuilding and all the accompanying site utilities, parking, pedestrian paths, landscaping, etc.
CityBC
Posted
Oct 29, 2026
Nov 23, 2026
The purpose of this RFP is to request proposals from qualified manufacturers and contractors with demonstrated experience in the supply and installation of a prefabricated, steel-framed, fabric-covered salt storage shed. The installation of the shed is expected to be completed in the Spring of 2027.
Decision makers connected to this RFP from City of Cambridge.