Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS site preparation and de-watering; 2 EA furnish and install submersible pumps; 1 LS furnish and install pump control panel and SCADA; 1 LS station electrical work; 1 LS furnish and install piping, valves and valve vaults; 1 LS furnish and install emergency generator; 3,380 SF furnish and install 4' thick rock base; 183 LF furnish and install 8" high screen and security wall; 62 LF furnish and install chain link fence. See outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Furnishing and installation of a new Pre-Fabricated Engineered Suction Lift Pump Package within the existing sewer lift station.
Posted Date
-
Due Date
Jan 13, 2026
Close: Jan 13, 2026
Furnishing and installation of a new Pre-Fabricated Engineered Suction Lift Pump Package within the existing sewer lift station.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
Posted Date
Dec 12, 2025
Due Date
Jan 14, 2026
Release: Dec 12, 2025
Close: Jan 14, 2026
Work includes lift station improvements consisting of the replacement of two vacuum prime wastewater pumping stations including new suction and discharge piping and supports and miscellaneous appurtenances.
Release: -
Close: Feb 4, 2026
Proposed lift station 4-7 improvements.
AvailableThe work consists of approx. the construction of a new lift station to replace the existing station, including the construction of a new wet well, gravity sewer, force main, generator and electrical building, standby power system, and demolition of the existing lift station. The work also includes site work improvements, HVAC, electrical, and other ancillary work required to accomplish the modifications. See outside link for more details.
Posted Date
Jan 6, 2026
Due Date
Feb 5, 2026
Release: Jan 6, 2026
Close: Feb 5, 2026
The work consists of approx. the construction of a new lift station to replace the existing station, including the construction of a new wet well, gravity sewer, force main, generator and electrical building, standby power system, and demolition of the existing lift station. The work also includes site work improvements, HVAC, electrical, and other ancillary work required to accomplish the modifications. See outside link for more details.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →