Fifth Harbor LLC
Work includes 1 LS site preparation and de-watering; 2 EA furnish and install submersible pumps; 1 LS furnish and install pump control panel and SCADA; 1 LS station electrical work; 1 LS furnish and install piping, valves and valve vaults; 1 LS furnish and install emergency generator; 3,380 SF furnish and install 4' thick rock base; 183 LF furnish and install 8" high screen and security wall; 62 LF furnish and install chain link fence. See outside link.
Lake Stevens Sewer District
Work includes construct the lift station generator improvements. The scope of work for this project includes modifications to five small, separate lift stations within the sewer district service area. These lift stations are station 2, 3, 4, 5, and 6. Work at lift station 2 (schedule a) includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, electrical modifications, and installation of a new, larger electrical service. Work at lift station 3 (schedule b) includes demolition of existing generator equipment, procurement and installation of a new diesel generator with custom subbase fuel tank, modifications to the existing cmu building, and electrical modifications. Work at lift station 4 (schedule c) Includes demolition of an existing generator building, construction of a new electrical stanchion, procurement and installation of a new diesel generator with subbase fuel tank and sound enclosure, site improvements, and electrical modifications. Work at lift station 5 (schedule d) includes demolition of an existing fuel tank and accompanying building, procurement and installation of a new diesel generator with subbase fuel tank, modifications to the existing concrete roof slab, site and concrete work, and electrical modifications.
Turtle Mountain Band of Chippewa Indians
Provide construction of BIA 10 and green acres sewer and lift station improvements. 1 LS Mobilization; 1 LS Compaction Testing Services; 1 LS Community Lift Station with Standby Generator, Propane Tank, and Owner Supplied Control Panel; 8,725 LF 8" SDR-35 PVC Gravity Sewer Main; 550 LF 8" SDR-35 PVC Sewer Main Boring & Jacking with 16" Steel Casing; 2,180 LF 8" SDR-35 PVC Sewer Main Pilot Tube Guided Auger Boring with 16" Steel Casing; 7,140 LF 4" Schedule 40 PVC Sewer Service Line; 635 LF 4" Schedule 40 PVC Sewer Service Line Boring & Jacking with 8" Steel Casing; 5 EA House Sewer Connection; 65 EA 4" x 8" Wye Branches; 160 VF Sewer Service Line Risers; 44 EA Sewer Service Line Single Cleanout; 65 EA Sewer Service Line Double Cleanout. See attached file.
City of Emporia
Construction of new 72" diameter wet well with wet well mounted duplex lift station, demolition of existing vacuum prime lift station. Site improvements including gravel surfacing, concrete pavement, and chain link security fence.
Town of Eatonville
The project consists of the demolition of the existing lift station facilities and construction of a new duplex pump station, above ground valve assembly, electrical instrumentation and controls system, generator pad with diesel generator, 8-inch diameter gravity sewer, 4-inch PVC force main, one (1) gravity sewer doghouse manhole, lining of existing gravity sewer manhole and concrete flume