Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Fifth Harbor LLC
Work includes 1 LS site preparation and de-watering; 2 EA furnish and install submersible pumps; 1 LS furnish and install pump control panel and SCADA; 1 LS station electrical work; 1 LS furnish and install piping, valves and valve vaults; 1 LS furnish and install emergency generator; 3,380 SF furnish and install 4' thick rock base; 183 LF furnish and install 8" high screen and security wall; 62 LF furnish and install chain link fence. See outside link.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
City of Benton Harbor
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
Posted Date
Nov 11, 2025
Due Date
Dec 18, 2025
Release: Nov 11, 2025
City of Benton Harbor
Close: Dec 18, 2025
Work include includes improvements to six existing lift stations and complete replacement of a seventh lift station. Improvements to six lift stations include items such as generator replacements, fencing, pump replacement, valve vault hatch replacement, driveway construction, plugging gravity sewer, electrical upgrades, and all associated removals. Crystal avenue lift station calls for partial removal and abandonment of the existing lift station and a proposed duplex submersible lift station, control panel, valves, piping, and all associated appurtenances.
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Town of Eatonville
The project consists of the demolition of the existing lift station facilities and construction of a new duplex pump station, above ground valve assembly, electrical instrumentation and controls system, generator pad with diesel generator, 8-inch diameter gravity sewer, 4-inch PVC force main, one (1) gravity sewer doghouse manhole, lining of existing gravity sewer manhole and concrete flume
Posted Date
Oct 27, 2025
Due Date
Dec 4, 2025
Release: Oct 27, 2025
Town of Eatonville
Close: Dec 4, 2025
The project consists of the demolition of the existing lift station facilities and construction of a new duplex pump station, above ground valve assembly, electrical instrumentation and controls system, generator pad with diesel generator, 8-inch diameter gravity sewer, 4-inch PVC force main, one (1) gravity sewer doghouse manhole, lining of existing gravity sewer manhole and concrete flume
AvailableMaysville Regional Water And Sewer District
The project includes approx. 11,800 LF of 2" pressure sewer, 3,200 LF of 1-1/2" pressure service lateral, 2,750 LF of 2" pressure service lateral, 20 simplex grinder pump stations, 2 duplex grinder pump stations, and upgrades to the main lift stations which includes replacing pumps, controls, electrical, and emergency generator. The work includes piping, site work, electrical, and all other work required for the completion of the project.
Posted Date
Nov 25, 2025
Due Date
Dec 18, 2025
Release: Nov 25, 2025
Maysville Regional Water And Sewer District
Close: Dec 18, 2025
The project includes approx. 11,800 LF of 2" pressure sewer, 3,200 LF of 1-1/2" pressure service lateral, 2,750 LF of 2" pressure service lateral, 20 simplex grinder pump stations, 2 duplex grinder pump stations, and upgrades to the main lift stations which includes replacing pumps, controls, electrical, and emergency generator. The work includes piping, site work, electrical, and all other work required for the completion of the project.
AvailableCity of Ormond Beach
Convert an existing wet pit/dry pit sewage lift station to a submersible lift station by removing all the block and frame construction, and a portion of the cast-in-place concrete construction; removing all equipment and material from within the generator room; the hvac equipment room; all piping material/equipment from within the dry pit pump area; all electrical equipment from within the electrical room; installing owner-supplied new submersible pumps in the wet well; site improvements and restoration.
Posted Date
Nov 9, 2025
Due Date
Dec 16, 2025
Release: Nov 9, 2025
City of Ormond Beach
Close: Dec 16, 2025
Convert an existing wet pit/dry pit sewage lift station to a submersible lift station by removing all the block and frame construction, and a portion of the cast-in-place concrete construction; removing all equipment and material from within the generator room; the hvac equipment room; all piping material/equipment from within the dry pit pump area; all electrical equipment from within the electrical room; installing owner-supplied new submersible pumps in the wet well; site improvements and restoration.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.