Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes sewer, water and storm drain improvements.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
Posted Date
Dec 1, 2025
Due Date
Jan 26, 2026
Release: Dec 1, 2025
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Wet well access improvements include replacing two (2) existing 48" circular wet well manhole covers with new rectangular hatches and replacing corroded existing slide gate guides with new stainless steel guides. The valve replacement will replace five (5) existing 16-inch pump check valves and three (3) existing 6" wet well drain valves. The Work will require implementation of traffic control and temporary sewer bypass of the pump station. Other work includes concrete demolition, partial regrading of the pump station driveway, and PVC liner repair.
AvailableThe Town of Eagle, Colorado is soliciting bids for streetscape and utility improvements on Capitol Street. The project is expected to include upgrades to pedestrian and streetscape elements along with utility replacements or improvements. Bids are due February 13, 2026 at 12:00 PM MST.
Posted Date
Jan 12, 2026
Due Date
Feb 13, 2026
Release: Jan 12, 2026
Close: Feb 13, 2026
The Town of Eagle, Colorado is soliciting bids for streetscape and utility improvements on Capitol Street. The project is expected to include upgrades to pedestrian and streetscape elements along with utility replacements or improvements. Bids are due February 13, 2026 at 12:00 PM MST.
AvailableThe work to be performed shall include but not be limited to: installation of all underground backbone utilities in support of the Cultural Terrace including installation of both wet utilities (water, stormwater, fire water, and irrigation), and dries (electrical, communications, EV and solar-ready conduits, and gas), from utility purveyor tie-in points along Marine Way and Skyhawk, and other items not mentioned here, but required within the Special Provisions.
Posted Date
Nov 26, 2025
Due Date
Jan 27, 2026
Release: Nov 26, 2025
Close: Jan 27, 2026
The work to be performed shall include but not be limited to: installation of all underground backbone utilities in support of the Cultural Terrace including installation of both wet utilities (water, stormwater, fire water, and irrigation), and dries (electrical, communications, EV and solar-ready conduits, and gas), from utility purveyor tie-in points along Marine Way and Skyhawk, and other items not mentioned here, but required within the Special Provisions.
AvailableWork includes approx. 9,928 LF of 8" through 4" water, 15,835 LF of 18", 12", 10", and 8" sanitary sewer, and 3,556 LF of 42" RCP through 18" RCP storm sewer,
Posted Date
Dec 16, 2025
Due Date
Jan 19, 2026
Release: Dec 16, 2025
Close: Jan 19, 2026
Work includes approx. 9,928 LF of 8" through 4" water, 15,835 LF of 18", 12", 10", and 8" sanitary sewer, and 3,556 LF of 42" RCP through 18" RCP storm sewer,
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →